Results for: Boiler Parts
Find the latest Boiler Parts tenders from different organizations. SigmaTenders helps you participate in these online e-Procurement tenders. We provide access to tender details, BOQs, and technical bids, along with bidding support for Boiler Parts e-tenders. Stay informed with daily email alerts and comprehensive coverage across government websites, GeM, and e-Procurement portals.
Preventive /breakdown maintenance work of pressure parts and round the clock routine work of boiler of unit no. 3 4, 2x210 mw of btps, parichha.
Preventive /breakdown maintenance work of pressure parts and round the clock routine work of boiler of unit no. 3 4, 2x210 mw of btps, parichha.
Preventive breakdown maintenance work of pressure parts and round the clock routine work of boiler of unit no 3 4, 2x210 mw of btps, parichha
Preventive breakdown maintenance work of pressure parts and round the clock routine work of boiler of unit no 3 4, 2x210 mw of btps, parichha
Arc of boiler and auxiliaries ie pressure parts hp valves firefighting system and pumps etc of 2x300 mw unit i and ii dcrtpp yamuna nagar
Arc of boiler and auxiliaries i.e. pressure parts h.p valves firefighting system and pumps etc of 2x300 mw unit i and ii dcrtpp yamuna nagar
Ttps es em iii replacement of wornout essential spare parts by new ones of freight cum passenger lift sl.nolm 2681 in unit v boiler area
Ttps es em iii replacement of wornout essential spare parts by new ones of freight cum passenger lift sl.nolm 2681 in unit v boiler area
Mtps i bm aoh 2025 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Mtps i bm aoh 2025 unit i boiler pressure parts replacing overheated hrh stub bends and other circuit bends at penthouse area and allied works
Replacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Replacement of goose neck panel and bends (under capex 2025-26), rear water wall panel and overhauling of boiler pr. parts at unit #3, ktps.
Bm- service charges for conducting radiography (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.
Bm- service charges for conducting radiography (non- destructive test) on welding joints in pressure parts of unit-9 boiler during unit-9 annual overhaul works.
Mtps i bm unit iii boiler pressure parts aoh 2024 disposal of ash from pent house, eco hopper deflection slope rear arch room and boiler roof area and strengthening of eco hopper supports with new pipes and allied works
Mtps i bm unit iii boiler pressure parts aoh 2024 disposal of ash from pent house, eco hopper deflection slope rear arch room and boiler roof area and strengthening of eco hopper supports with new pipes and allied works
🏭 Tender Announcement for MTPS I BM Unit III Boiler Enhancements 🏭 TNEB Limited, a State Government Undertaking, is seeking bids for the comprehensive enhancement and disposal project at Mettur Thermal Power Station-I/Mettur Dam. The project includes the Annual Overhauling of Boiler pressure parts for MTPS I BM Unit III for AOH 2024, along with the disposal of ash from various designated areas, and the strengthening of the Eco hopper supports with new pipes and associated works. 📅 Bid Submission Deadline: April 15, 2024, 2:00 PM A tender fee of INR 6200 is applicable, with no EMD required. Interested contractors must submit detailed proposals, including technical specifications, methodology, and cost estimates, adhering to the project's environmental and safety standards. Keywords: TNEB Limited, MTPS I BM Unit III, Boiler Enhancement, Ash Disposal, Eco Hopper Strengthening, State Government Undertaking, Tender, Environmental Standards, Safety Standards
Procurements of various boiler pressure parts items like sliding spacers,dissimilar welds and orifice complete assembly tube,orifice plate and orifice and header bends used in different zones of the boiler furnace in the boilers of 2x660 mw, sstpp
Procurements of various boiler pressure parts items like sliding spacers,dissimilar welds and orifice complete assembly tube,orifice plate and orifice and header bends used in different zones of the boiler furnace in the boilers of 2x660 mw, sstpp
Ttps mech ii bm unit iii removal and relaying of worn out damaged cladding sheet refractory and insulation lagging at various elevations of boiler pressure parts valves down comer pipe lines in unit iii boiler during overhaul 2025 2026
Ttps mech ii bm unit iii removal and relaying of worn out damaged cladding sheet refractory and insulation lagging at various elevations of boiler pressure parts valves down comer pipe lines in unit iii boiler during overhaul 2025 2026
Need support responding to this opportunity?
Get matched through GetSaarthi for documentation, proposal preparation, compliance readiness, and execution support.
Get Opportunity Matching Supportof your Industry type