Tender Details
Particulars | Details |
---|---|
Title |
Overhauling Of Non Pressure Parts Duct, Damper, Expansion Bellows And Gates Of 250 Mw Bhel Make Boiler Of Unit 8,Dpl
|
Description |
Overhauling Of Non Pressure Parts Duct, Damper, Expansion Bellows And Gates Of 250 Mw Bhel Make Boiler Of Unit 8,Dpl
|
Organisation | THE DURGAPUR PROJECTS LIMITED | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 91000 |
Tender Value | |
Place | Office of the GM P and P PP |
Link |
AAAAAAAAAA Login to view |
Start Date | April 28, 2025 15:30 |
End Date |
10/05/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4
Overhauling of boiler non-pressure parts (air pre heater and flue/air ducts), unit 4
Read moreReplacement of economiser coil (120 nos) and unit #4 boiler pr. parts oh.
Replacement of economiser coil (120 nos) and unit #4 boiler pr. parts oh.
Read moreResidual life assessment study of unit-5 boiler (210 mw bhel make)
Residual life assessment study of unit-5 boiler (210 mw bhel make)
Read moreWork contract for engagement of third party supervisory agency for inspection and supervision work of boiler pressure parts during forthcoming aoh or coh of super-critical thermal power unit of mppgcl
Work contract for engagement of third party supervisory agency for inspection and supervision work of boiler pressure parts during forthcoming aoh or coh of super-critical thermal power unit of mppgcl
Read moreAnnual overhauling of l and t make esp of unit 4,2x660 mw,sstpp,mppgcl,dongalia
Annual overhauling of l and t make esp of unit 4,2x660 mw,sstpp,mppgcl,dongalia
Read moreOverhauling of rotary air pre-heater of bhel make 250 mw boiler, dpl.
Overhauling of rotary air pre heater of bhel make 250 mw boiler, dpl.
Read moreOverhauling of non pressure parts duct, damper, expansion bellows and gates of 250mw bhel make boiler of unit 8,dpl
Overhauling of non pressure parts duct, damper, expansion bellows and gates of 250mw bhel make boiler of unit 8,dpl
Read moreThermal insulation of boiler drum, crh header, bottom header area and drain and vent line of unit 7 dpps during overhauling period.
Thermal insulation of boiler drum, crh header, bottom header area and drain and vent line of unit 7 dpps during overhauling period.
Read moreOverhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Overhauling of procon make annunciation system along with contacts cleaning, tightening of terminals and reconditioning of yokogawa dcs panels during oh of unit 6 of 2x250mw, ctps, parichha, jhansi
Read moreof your Industry type