Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Balance Work Required For Existing Piped Water Supply Schemes
|
Description |
Survey, Investigation, And Necessary Construction Of Balance Work Required For Existing Piped Water Supply Schemes Of Block Harda Distt. Harda
|
Organisation | Public Health Engineering- O/o Engineer In Chief | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 16534 |
EMD | 2.4 Lakh |
Tender Value | |
Place | WORK |
Link |
AAAAAAAAAA Login to view |
Start Date | April 29, 2025 20:40 |
End Date |
14/05/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreSelection of bidder for purchase of one hundred percent shares in electricity company responsible for distribution and retail supply of electricity and having distribution license in the union territory of andaman and nicobar islands
Refer rfp for details of proposal, bid security details, general instruction to the bidders and all other matters related to the bid
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreIe services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Ie services for construction of 4-lane gf sagar western bypass from km 0.000 (km 181.000 on nh-146) near lahdara village junc. on nh-146 to km 20.193 (km 223.200 on nh-44) near berkheri guru village junc. on nh-44 of length-20.193 km in mp on ham
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreProtection work to sump well and headwork of supply channel of solar lift irrigation at lalung thasgam (under the lift irrigation scheme of lalung and gontabsa thasgam
Protection work to sump well and headwork of supply channel of solar lift irrigation at lalung thasgam (under the lift irrigation scheme of lalung and gontabsa thasgam
Read moreConstruction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreFor supply installation including civil work and commissioning of 100kva d.g set
For supply installation including civil work and commissioning of 100kva d.g set
Read moreof your Industry type