Tender Details
Particulars | Details |
---|---|
Title |
Supply And Delivery Of Bore Well Materials For Repairs And Maintenance Of Bore Wells Under A.E 24 Section In Ward Nos.5,6,7 8 For The Period Of 12 Months.
|
Description |
Supply And Delivery Of Bore Well Materials For Repairs And Maintenance Of Bore Wells Under A.E 24 Section In Ward Nos.5,6,7 8 For The Period Of 12 Months.
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id | 746594 |
Reference Number |
06/2024-25/EE-I(WSS-M)/DB/Dt.30-07-2024/Item-15 |
Tender Fee | 497 |
EMD | 14025 |
Tender Value | |
Place | AP |
Link | https://tender.apeprocurement.gov.in |
Start Date | August 01, 2024 03:30 |
End Date |
16/08/2024 ( Expired 297 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreIe services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreMiscellaneous civil repairs and maintenance works at tezpur airport for 2025 26 for a period of twelve months
Miscellaneous civil repairs and maintenance works at tezpur airport for 2025 26 for a period of twelve months
Read moreAnnual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Annual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.
Read moreAnnual civil repairs and maintenance of kdm complex, rkoea,ongc, jodhpur for a period of three years(36 months)
Annual civil repairs and maintenance of kdm complex, rkoea,ongc, jodhpur for a period of three years(36 months)
Read moreAnnual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Annual work contract for operation and maintenance of steam boilers and softener plants in rtc hours by engaging qualified first and second class licensed boiler attendants at karp for the period of 12 months
Read moreRate contract for the work of designing, providing, installation and commissioning of solar energy based bore well water pumping systems,including comprehensive operation and maintenance for a period of seven years in various villages/ towns of jaipu
Rate contract for the work of designing, providing, installation and commissioning of solar energy based bore well water pumping systems,including comprehensive operation and maintenance for a period of seven years in various villages/ towns of jaipu
Read moreConstruction of 1 unit ramp with handrail in 12 nos. elementary level schools under ambassa, salema and durgachowmuhani block of dhalai district under samagra shiksha for the year 2024-25
Construction of 1 unit ramp with handrail in 12 nos. elementary level schools under ambassa, salema and durgachowmuhani block of dhalai district under samagra shiksha for the year 2024-25
Read moreof your Industry type