Tender Details

Particulars Details
Title
Erection Of 19.22 Km 11 Kv Line Alongwith Ss For Release Of Phed Connections In Favor Of Xen Phed Project Chitalwana Under Aen O And M Chitalwana
Description
Erection Of 19.22 Km 11 Kv Line Alongwith Ss For Release Of Phed Connections In Favor Of Xen Phed Project Chitalwana Under Aen O And M Chitalwana
Organisation Jodhpur VVNL - MD | State Govt. and UT
Tender Id 2024_JdVVN_432190_1
Reference
Number
ZCE/BMRZ/TNO.05/24-25/D1273 D21-11-2024
Tender Fee 4130
EMD 26095
Tender Value
Place CHITALWANA
Link https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=776793
Start Date November 22, 2024 21:30
End Date

06/12/2024 ( Expired 169 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years

Hiring the services of one number brand new mahindra bolero b4 with ac, 7 seater, diesel driven bs vi model or equivalent for use in row patrolling of mainline from plkm0.0 to plkm34.0 and branch line from plkm0.0 to plkm38.0 under pump station 1 jurisdiction for a period of 4 years

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Independent engineer services during o and m stage of four laning of kaithal rajasthan border section of nh-65 (new nh-52-152) from km. 33.250 (design km. 0.500) to km. 241.580 (design km. 165.759) in the state of haryana under nhdp phase- iv through

Read more
Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Independent engineer (ie) services during o and m period of four laning of gujarat maharashtra border-surat-hazira port section of nh-6 (approx. length 131.500 km) in the state of gujarat under nhdp phase iii on dbfot mode

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise