Tender Details

About Tender

๐ŸŒ‰ Invitation For Bids: Construction Of Rcc Bridge At Silghat ๐Ÿ—๏ธ๐ŸŒซ๏ธ The Public Works Roads Department, State Govt. And Ut, Invites Bids From Reputable Contractors For The Construction Of A Reinforced Cement Concrete (Rcc) Bridge No. 1/1 Over The River Barak At Silghat, Cachar, On The Baskandi Silghat Road. ๐Ÿ› ๏ธ ๐Ÿ“ Location: Silghat, Cachar ๐Ÿ“… Deadline: April 03, 2024, 2:00 Pm The Project Includes The Construction Of The Bridge, Approaches, And Protection Works, Connecting Rupailbali, Singerbond, And Binnakandi With Silchar And Lakhipur Town. Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 16,76,800 Along With A Tender Fee Of Inr 30,000. Interested Contractors Should Prepare And Submit Detailed Bids, Including Technical And Financial Proposals, In Accordance With The Specifications Outlined In The Tender Document. Keywords: Construction, Rcc Bridge, Public Works Roads Department, Cachar, Crif, Tender, Emd, Bid Submission, Infrastructure Development
Particulars Details
Title
Cachar/Crif/2023 24/07 Construction Of Rcc Bridge No. 1/1 Over River Barak At Silghat On Baskandi Silghat Road Connecting Rupailbali, Singerbond And Binnakandi With Silchar And Lakhipur Town Including Approaches And Protection Works Under Central Ro
Description
Cachar/Crif/2023 24/07 Construction Of Rcc Bridge No. 1/1 Over River Barak At Silghat On Baskandi Silghat Road Connecting Rupailbali, Singerbond And Binnakandi With Silchar And Lakhipur Town Including Approaches And Protection Works Under Central Ro
Organisation Public Works Roads Department | State Govt. and UT
Tender Id 2024_PWD_37265_1
Reference
Number
Cachar/CRIF/2023-24/07
Tender Fee 21136
EMD 1.41 Lakh
Tender Value
Place Cachar
Link https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=63191
Start Date September 14, 2024 00:25
End Date

03/10/2024 ( Expired 267 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Read more
Cachar/crif (setu bandhan)/2024-25/01

Construction of rcc bridge no. 1/1 over river barak at gandhighat near rice mill connecting madhuramukh with silchar including approach and protection works under central road infrastructure fund (crif) for the year 2024-25, bridge length 340.00m.

Read more
- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road

- (1) consultancy service for preliminary and detailed engineering including preparation of detailed project report for replacement of cable stayed suspension foot bridge by construction of rcc bridge over dhalai river on manikbhander to darang road

Read more
Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.

Construction of a new 2 lane parallel bridge,approach road, and protection works near the damaged long bridge at kilometer 38 over the sot river on shahabad- bisauli-kachhla ganga ghat (nh-109) route in district badaun.

Read more
Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for 2019-20

Balance work for construction of rcc br.no.4/1 on road from nh-39 to old nd road via balipathar shyam gaon over river dhansiri at neparpatty ferry ghat including approaches and protection works under mlcsna under ridf-xxv of nabard for the year 2019-

Read more
Stbr/sopd-g/jonai/01 construction of rcc bridge no. 3/1(br. length 257.96m) over river jelem on nh-515 at purana jelem to kemi gaon under jonai (st) lac under jonai territorial road division for the year 2023-24( ch.2645.00m to ch.5690.00m)

Stbr/sopd-g/jonai/01 construction of rcc bridge no. 3/1(br. length 257.96m) over river jelem on nh-515 at purana jelem to kemi gaon under jonai (st) lac under jonai territorial road division for the year 2023-24( ch.2645.00m to ch.5690.00m)

Read more
Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Pwd-nh(br)/ran/sopd/2024-25/01 construction of new bridge over river mangoldoi (br.no 35/1) including approaches, service road and drain in place of the abandoned bailey bridge on nh-15 under sopd for the year 2024-25 under pwd rangia nh division in

Read more
Stbr/sopd-g/doomdooma-01 construction of rcc br. no. 1/1 (balance work) over doomdooma river on old a.t road including approaches under digboi and margherita territorial road division, tinsukia (doomdooma lac) under sopd-g for the year 2024-25

Stbr/sopd-g/doomdooma-01 construction of rcc br. no. 1/1 (balance work) over doomdooma river on old a.t road including approaches under digboi and margherita territorial road division, tinsukia (doomdooma lac) under sopd-g for the year 2024-25

Read more
Package no. stbr/sopd-g/ khowang/01 construction of rcc bridge over river demow at hunghungia to naharoni sonowal gaon including approaches and protection works in khowang lac under sopd-g for the year 2024-25

Package no. stbr/sopd-g/ khowang/01 construction of rcc bridge over river demow at hunghungia to naharoni sonowal gaon including approaches and protection works in khowang lac under sopd-g for the year 2024-25

Read more
Construction of sub structure (abutments) including approaches with permanent works including design and drawings of abutments (duly proof checked) on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed

Construction of sub structure (abutments) including approaches with permanent works including design and drawings of abutments (duly proof checked) on open foundation over teesta river for 230 feet single lane modular steel bridge (to be constructed

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise