Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Beautification And Industrial Development Work On Mahatma Gandhi Marg From Tulsidas Statue Intersection To Patthar Church.
|
| Description |
Beautification And Industrial Development Work On Mahatma Gandhi Marg From Tulsidas Statue Intersection To Patthar Church.
|
| Organisation | Allahabad Development Authority | State Govt. and UT |
| Tender Id | 2024_ADAUP_971911_1 |
|
Reference Number |
57/1/CE/DA/2024 |
| Tender Fee | 354 |
| EMD | 25000 |
| Tender Value | |
| Place | 7-8 floor Indira Bhawan PDA Prayagraj |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1701532 |
| Start Date | November 08, 2024 20:30 |
| End Date |
Expired
14/11/2024
Expired 595 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Construction of cc road from gandhi chowk to sri siddeshwar temple in vijaypur city limits of vijaypur district. (including construction of duct, drain, foot-path and model street lighting)
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreRepair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Repair work of power channel road from mes bridge to fore bay and link road up to fagpur gate by means of premix carpet and bituminous macadam
Read moreDevelopment, maintenance, management and operation of greenfield high-speed corridor from mawlyngkhung (near shillong) in meghalaya to panchgram (near silchar) in assam by 4-laning with paved shoulders on hybrid annuity basis. (package-3)
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreEarth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch
Earth work in berms cutting, removal thecks in bed and strenthening of banks from km 0.200 to 33.000 at various reaches of shahjahanpur branch
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreof your Industry type