Tender Details
Particulars | Details |
---|---|
Title |
W90311605052 Drg: 1116050550000 Rev: 13 Impeller Assembly
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 14:35 |
End Date |
13/06/2025 ( 18 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreConstruction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Construction of bridge over swan river at km 13 450 on nh 503a in district una himachal pradesh
Read moreWater purification assembly
Supply, installation and demonstration of water purification assembly (ultra pure) as per annexed specification (annexure-1)
Read moreTotal kjeldhal nitrogen (tkn) assembly
Supply, installation and demonstration of total kjeldhal notrogen (tkn) assembly as per annexed specification (annexure-1)
Read moreObjective lens assembly,input lens assembly,imaging window,collimator window,imaging lens assembly,
Read more
Spot welding equipment for bottom plate sub assembly along with standard accessories and fixture, a
Read more
Rotating assembly for sct 150 by 24,rotating assembly for up 125 by 30a,rotating assembly for up 15
Read more
Servicing overhauling and maintenance of swas field equipments and wet panel and different other mechanical work during overhauling of unit no 13 of 2x200mw btps obra
Servicing overhauling and maintenance of swas field equipments and wet panel and different other mechanical work during overhauling of unit no 13 of 2x200mw btps obra
Read moreErection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13 btps obra
Read moreof your Industry type