Tender Details

Particulars Details
Title
Construction Of Compound Wall At North Side(towards Nagarkurnool I And Ii Bays Side) To The Extent Of 400 Kv Ss Land At 400/220 Kv Dindi Ss In Nagarkurnool District In Mahabubnagar Circle.
Description
Construction Of Compound Wall At North Side(towards Nagarkurnool I And Ii Bays Side) To The Extent Of 400 Kv Ss Land At 400/220 Kv Dindi Ss In Nagarkurnool District In Mahabubnagar Circle.
Organisation Information Technology Electronics and Communication Department Telangana | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 820
EMD 46310
Tender Value
Place TS
Link

AAAAAAAAAA

Login to view
Start Date June 30, 2025 22:30
End Date

30/07/2025 ( 29 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.

Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle

Read more
Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.

Construction of compound wall at north side(towards nagarkurnool i and ii bays side) to the extent of 400 kv ss land at 400/220 kv dindi ss in nagarkurnool district in mahabubnagar circle.

Read more
Substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).

765/400/220 kv ais extension package - substation package: ss-02 (i) 02 nos. of 400 kv line bays at 765/400/220 kv bikaner-iii ps for interconnection of 1400mw rppd of m/s sunbreeze renewables nine pvt. ltd. (sr9pl) (2 nos. bays).

Read more
Substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work

765/400/220 kv ais extension package - substation package ss-01 (i) 1 no. 220kv line bay at bikaner-iii ps for interconnection of 300mw regs of m-s deshraj solar energy pvt. ltd. (dsepl). (ii) 1 no. of 400 kv line bay at 765/400/220 kv bikaner-iii ps for interconnection of 1000mw rppd of m-s mrs buildvision pvt. ltd. (mbpl) and 400 kv bus extension work

Read more
Repairs to parapet wall, rooms, mumty, chajjas, roof of type-i, ii, iii residential quarters in estate at o. f. chanda.

Repairs to parapet wall, rooms, mumty, chajjas, roof of type-i, ii, iii residential quarters in estate at o. f. chanda

Read more
Construction of rain water harvesting system at 400/220 kv rajarhat gis ss

Construction of rain water harvesting system at 400/220 kv rajarhat gis ss

Read more
Construction of boundary wall at tehatta dak bunglow and repairing of hall of dakbanglow within tehatta gp under tehatta-i block in the district of nadia. 2nd call

Construction of boundary wall at tehatta dak bunglow and repairing of hall of dakbanglow within tehatta gp under tehatta-i block in the district of nadia. 2nd call

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
(i) repairing of damaged boundary wall at ncl hq, singrauli. (ii) replacement of indian wc to western wc in non-executive quarters at ncl hq, singrauli.

(i) repairing of damaged boundary wall at ncl hq, singrauli. (ii) replacement of indian wc to western wc in non-executive quarters at ncl hq, singrauli.

Read more
Jadcherla municipality infrastructure development works in ulbs with tufdic assistance - construction of storm water drains in jadcherla municipality (2nd call)

Jadcherla municipality infrastructure development works in ulbs with tufidc assistance -construction of storm water drains in jadcherla municipality a. from devi theatre road to proposed culvert point at kista reddy land b. from veera shivaji nagar culvert to existing culvert near lorry association c. from vyapara sangam to veera shivaji nagar culvert through murali chicken centre d. from kabrasthan to vamshi hospital e. from vamshi hospital to khaleel auto electricals towards nagasala f. from pochamma temple cheruvu to old bus stand road through padmavathi colony g. from old bus stand road to gowda function hall culvert h. from laxmi nagar colony transformer to bund at srinivas nagar i. from church to vura cheruvu and kawrampet service road to vura cheruvu under tufidc assistance (2nd call)

Read more