Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of 110.50 M Cc Tiles Road And Drain From The Wall Of Idgah To Irshad House In Village Alhapur Bhikan, Block Kundari, District Moradabad. (Nidhi Work)
|
Description |
Construction Work Of 110.50 M Cc Tiles Road And Drain From The Wall Of Idgah To Irshad House In Village Alhapur Bhikan, Block Kundari, District Moradabad. (Nidhi Work)
|
Organisation | U.P. State Construction and Infrastructure Development Corporation Ltd. | State Govt. and UT |
Tender Id | 2025_SCIDC_1038126_1 |
Reference Number |
024/EE/MBD/NIDHI/2025-26 Dt. 09-05-2025 |
Tender Fee | 1062 |
EMD | 12000 |
Tender Value | |
Place | MORADBAD |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1881713 |
Start Date | May 10, 2025 15:00 |
End Date |
16/05/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreO and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode
Read moreConstruction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Construction of cc road and drain from kk shrivastav factory to trinching groun at ward no 10 and 12 tikamgarh
Read moreConstruction of r.c.c. wall in front of service road green belt area from nipaniya square to bombay hospital squareunder garden civil department (h.q.).
Construction of r.c.c. wall in front of service road green belt area from nipaniya square to bombay hospital squareunder garden civil department (h.q.).
Read moreConstruction of cc road and rcc drain at various places in ward no. 05 of nagar parishad bilhara
Construction of cc road and rcc drain at various places in ward no. 05 of nagar parishad bilhara
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreConstruction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Construction of rcc ramp cum road along with rcc retaining wall for unloading of ld oil from tankers near hfo / ldo storage pump house at atps, mppgcl, chachai.
Read moreConstruction work of rcc drain in different place at bhairunda
Const. of rcc drain from rashid bashid to shahadat master house, from shriram to mr. gambhir house, and from rashid bashid to suraj house, and from mr. hiralal to mr. amarsingh house, and from. chotu ustad to saddam drain in ward no 04 bhailal colony
Read moreUnder the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Under the fourth phase of mukhyamantri urban infrastructure, construction of covered drain from bus stand to krishak sammelan bhawan in ward number 13 and 14.
Read moreof your Industry type