Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐๐จ Monthly Hiring Opportunity For Cab And Taxi Services ๐๐จ The Ministry Of Power, Through Its Contracts And Materials Department, Is Seeking Proposals For The Monthly Hiring Of Su Vs, Diesel Driven Hardtop Vehicles, For Cab And Taxi Services Without Fuel Provision. ๐ ๐๏ธ Proposal Submission Deadline: July 23, 2024, 10:00 Am Interested Service Providers Are Invited To Submit Detailed Proposals, Highlighting Their Capacity To Meet The Ministry's Transportation Needs On A Monthly Basis. Keywords: Cab And Taxi Hiring, Suv, Diesel Driven, Hard Top Vehicle, Ministry Of Power, Government Contract, Transportation Services| Particulars | Details |
|---|---|
| Title |
Monthly Basis Cab And Taxi Hiring Service Without Fuel Suv; Diesel Driven Hard Top Vehicle With
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2024/B/5080094 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 25, 2024 15:26 |
| End Date |
Expired
23/07/2024
Expired 812 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
LAKSHMI CAR SERVICE
107892
Technical Evaluation Results
| S.No. | Seller Name | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | Almighty Manpower & Security Services | 21-07-2024 13:51:13 | Central / State PSUs | N/A | Disqualified |
| 2 | Angel Manpower & Security Services | 21-07-2024 10:39:02 | Central / State PSUs | N/A | Disqualified |
| 3 | KING AND ANGEL DIAMOND SERVICES PRIVATE LIMITED | 21-07-2024 13:56:17 | Central / State PSUs | N/A | Disqualified |
| 4 | LAKSHMI CAR SERVICE | 23-07-2024 03:03:22 | Registered with designated Agency / Authority | MSE | Qualified |
| 5 | LOKENATH ENTERPRISE | 22-07-2024 20:53:35 | Registered with designated Agency / Authority | MSE | Qualified |
| 6 | MAJUMDAR TRADERS | 23-07-2024 03:14:35 | Registered with designated Agency / Authority | MSE | Qualified |
| 7 | PINAKINE SECURE SECURITY SOLUTIONS | 21-07-2024 13:35:34 | Central / State PSUs | N/A | Disqualified |
| 8 | Safe Shadow Security Services | 21-07-2024 15:00:56 | Central / State PSUs | N/A | Disqualified |
| 9 | Sky High Secure Security Services | 21-07-2024 13:51:31 | Central / State PSUs | N/A | Disqualified |
| 10 | SMVD Group Secure Services | 21-07-2024 14:46:42 | Central / State PSUs | N/A | Disqualified |
| 11 | TRIPATHI BROTHERS SERVICES | 21-07-2024 13:47:14 | Central / State PSUs | N/A | Disqualified |
| 12 | TRIPATHI BROTHERS SERVICES PRIVATE LIMITED | 21-07-2024 13:49:39 | Central / State PSUs | N/A | Disqualified |
| 13 | Vaikunth Group Enterprises | 21-07-2024 12:26:31 | Central / State PSUs | N/A | Disqualified |
Ordered Items & Contract Pricing
| Service | Category Name | Ordered Quantity | Price |
|---|---|---|---|
| Monthly Basis Cab and Taxi Hiring Service - Without Fuel - SUV; Diesel driven Hard Top Vehicle with sitting capacity seven 6plus1 persons or above non AC make TATA Mahindra or equivalent; Registration of the vehicle should not be older than five 0.. | Monthly Basis Cab and Taxi Hiring Service - Without Fuel | 1 | โน 107892.000 |
Repairing/overhauling of vehicle no. up64at-5425 (diesel tanker) and up64bt-0534 (fog cannon)
Repairing/overhauling of vehicle no. up64at-5425 (diesel tanker) and up64bt-0534 (fog cannon)
Read moreRepairing fabrication of exhaust muffler and engine cover base and mast pin base top cover etc. of rel650dii and idm30dii diesel drill machines
Repairing fabrication of exhaust muffler and engine cover base and mast pin base top cover etc. of rel650dii and idm30dii diesel drill machines
Read moreRepair of power supply unit (psu) card of vermont make flowmeter installed in the top loading system at diesel pump station, unit store, ilbl ocp
Repair of power supply unit (psu) card of vermont make flowmeter installed in the top loading system at diesel pump station, unit store, ilbl ocp
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreMonthly basis cab and taxi hiring service - without fuel - suv; diesel driven hard top vehicle with
Read more
of your Industry type