Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Br/Wr/51241/Nit/ Detailed Drawing/Lc/ 01
|
| Description |
Preparation Of Detailed Engineering Drawing From Basic Layout For Structural Works On Lab Contract Basis In Connection With Redevelopment Of Udhna Station At Udhna Of Mumbai Division In Western Railway At Udhna Railway Station Surat Gujarat
|
| Organisation | Department of Heavy Industry | Central Govt. Ministry/Department |
| Tender Id | 2025_DHI_785459_1 |
|
Reference Number |
BR/WR/51241/NIT/ DETAILED DRAWING/LC/ 01 |
| Tender Fee | 590 |
| EMD | 40000 |
| Tender Value | - |
| Place | Udhna Railway Station Surat Gujarat |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1089773 |
| Start Date | January 16, 2025 23:05 |
| End Date |
Expired
12/02/2025
Expired 612 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Corrosion coupon specifications as per appendix drawings, (detailed specification and drawing with d
Corrosion coupon specifications as per appendix drawings, (detailed specification and drawing with d
Read morePreparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Preparation of detailed project report (dprs) for various rob and rub works ( 81 nos lc) over north western railway
Read moreProvision of new gate lodge in lieu of existing old non standard gate lodge at lc-165,lc-168,lc-173,lc-174,lc-177,lc-180 & lc-185 in prn -bzm section in jhansi division.
Provision of new gate lodge in lieu of existing old non standard gate lodge at lc-165,lc-168,lc-173,lc-174,lc-177,lc-180 & lc-185 in prn -bzm section in jhansi division.
Read moreConducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Conducting feasibility study, investigation, detailed survey and detailed project report preparation and detailed design work in connection with elimination of level crossings by constructing 09 robs on following level crossings on jabalpur division of wcr.1) itarsi - jabalpur section 03 nos ( lc no. 285, 305 & 309) (2) jabalpur - manikpur section - 02 nos (lc no. 328 & 340) (3) katni - singrauli section - 02 nos (lc no. 67 & 88) (4) katni - satna section - 02 nos (one common ro
Read moreLc gate electronic slave telephone & master telephone of electronic lc gate
Lc gate electronic slave telephone & master telephone of electronic lc gate
Read morePreparation of dpr including detailed layout, design and drawing of infrastructure services for new industrial township in rahpura jagir, bareilly
Preparation of dpr including detailed layout, design and drawing of infrastructure services for new industrial township in rahpura jagir, bareilly
Read moreof your Industry type