Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For The Work Of Erection Of Heat Shrinkable Mounting Kit In Different Cables Of Main Sub Station Gvp Ph Ii.
|
| Description |
Estimate For The Work Of Erection Of Heat Shrinkable Mounting Kit In Different Cables Of Main Sub Station Gvp Ph Ii.
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_CCL_292411_1 |
|
Reference Number |
PE(EandM)/GVP/Tender/23-24/450 dt-30.10.23 |
| Tender Fee | - |
| EMD | 2400 |
| Tender Value | - |
| Place | P.E.(E and M), GVP Ph-II, PO Sawang Colliery, Dist |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | November 01, 2023 15:30 |
| End Date |
Expired
10/11/2023
Expired 1068 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairing of auxiliary motors and transformer of ekg5a shovel sl. no.hmb-523/exc-2500 of gvp ph-ii ocp
Repairing of auxiliary motors and transformer of ekg5a shovel sl. no.hmb-523/exc-2500 of gvp ph-ii ocp
Read moreSupply, erection, testing and commissioning of i) conversion of 132kv 2-ph double circuit line to 3-ph double circuit line (15km) from 220/132kv ss budidampadu to 132/25kv rtss-dornakal by stringing 3rd acsr panther conductor (ii) modification of 2nos.132kv bays from 2-ph to 3-ph at 220/132kv ss budidampadu and (iii) erection of 2nos 132kv metering bays at newly proposed 132/25kv rtss-dornakal in khammam district on turnkey basis
Supply, erection, testing and commissioning of i) conversion of 132kv 2-ph double circuit line to 3-ph double circuit line (15km) from 220/132kv ss budidampadu to 132/25kv rtss-dornakal by stringing 3rd acsr panther conductor (ii) modification of 2nos.132kv bays from 2-ph to 3-ph at 220/132kv ss budidampadu and (iii) erection of 2nos 132kv metering bays at newly proposed 132/25kv rtss-dornakal in khammam district on turnkey basis
Read moreDc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Dc work sc railways supply, erection, testing and commissioning of (i) conversion of existing 132kv 2 ph double circuit line to 3 ph double circuit line (4.5km) from 220/132kv ss malyalapalli along with erection of new 132kv 3 ph dc line of 4km to proposed 132kv railway traction substation (rtss) at ramagundam (ii) 2 nos. 132kv feeder bays at 220kv ss malyalapalli and (iii) 2 nos. 132kv metering bays at proposed 132kv ramagundam rtss in peddapally district on turnkey basis
Read moreKtps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg
Ktps-v stage - i and c - laying of cables from ucb to seal air pressure transmitters and erection of impulse lines and structures for seal air pressure transmitters of mills of units 9 and 10.-reg
Read moreEstimate for drilling of 6 5 dia borewell supply delivery and erection of suitable submersible pump set with accessories and laying and jointing of hdpe pipe line work at defence colony park ward no 188 c 4 moula ali malkajgiri zone ubd mmc 2026
Estimate for drilling of 6 5 dia borewell supply delivery and erection of suitable submersible pump set with accessories and laying and jointing of hdpe pipe line work at defence colony park ward no 188 c 4 moula ali malkajgiri zone ubd mmc 2026
Read moreOperation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagar
Operation and maintenance mgklis lift 1 (stage 1) pumping station consisting of 5 no.s of units with 30mw capacity and 800 cusecs discharge each at regumangadda, yellur (v), kollapur(m), nagarkurnool (district) for the period of three years i.e from 01.06.2023 to 31.05.2026 supply, erection, testing and commissioning of 2 x 30 kva, i/p 3 ph 415v ac and o/p 230v ac 1 ph 50hz parallel redundant ups system, at mgklis lift 1(stage 1) pumping station at regumangadda, yellur (v), kollapur (m), nagarkurnool (district)
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana
Read moreHeat shrinkable,heat shrinkable,heat shrinkable,heat shrinkable,heat shrinkable,heat shrinkable,hea
Read more
Erection of heat shrinkable mounting kit in different cables of regional sub-station, kathara for the period of 01 year when and ever required within 24 hours of breakdown.
Erection of heat shrinkable mounting kit in different cables of regional sub-station, kathara for the period of 01 year when and ever required within 24 hours of breakdown.
Read moreof your Industry type