Tender Details
Particulars | Details |
---|---|
Title |
Laying Of Clear Water Rising Main Pipe Line From Rwss Tapping Point To Wtp Bellaguntha In Connection With Sharing Of Drinking Water From Rwss For Water Supply To Bellaguntha Nac Under Aap 2024 25
|
Description |
Laying Of Clear Water Rising Main Pipe Line From Rwss Tapping Point To Wtp Bellaguntha In Connection With Sharing Of Drinking Water From Rwss For Water Supply To Bellaguntha Nac Under Aap 2024 25
|
Organisation | PHEO | State Govt. and UT |
Tender Id | 2025_PHEO_113292_1 |
Reference Number |
03/03/SPH(C )/ 2025-26 dt. 06.05.2025 |
Tender Fee | 4000 |
EMD | 7480 |
Tender Value | |
Place | Bellaguntha |
Link | https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=539042 |
Start Date | May 09, 2025 20:30 |
End Date |
19/05/2025 ( Expired 12 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Operation, maintenance and repairs to psc/ms raw water pipeline of dia. 1500/1200mm from hetawane dam to wtp, jite under hetawane water supply scheme.
Operation, maintenance and repairs to psc/ms raw water&#x0d pipeline of dia. 1500/1200mm from hetawane dam to wtp, jite under hetawane water supply scheme.
Read moreSitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Sitc of dewatering pump, invertor with battery, cleaning of outlet chamber for primary clarifier no. 2, laying of new pvc pipe line from rotameter outlet to cct tank and other work at 80 mld dinapur stp, varanasi.
Read moreProcurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Procurement of di pipe for the work construction of ugr laying of clear water rising main installation of pump and other allied work in connection with the work augmentation of water supply to tusura town.
Read moreRepair to external water supply pipe line, pump set, cleaning of oh tanks at hattigor and repair to dg set, voltage stabilizer and connected works at tamulpur, darranga and hattigor mil stn under ge rangia
Repair to external water supply pipe line, pump set, cleaning of oh tanks at hattigor and repair to dg set, voltage stabilizer and connected works at tamulpur, darranga and hattigor mil stn under ge rangia
Read moreRepair/ maintenance of internal/ external electrification, security lights, water supply pipe line including installation and lift with other misc e/m works at office complex and mandakini complex at pcda (af) under ge clement town
Repair/ maintenance of internal/ external electrification, security lights, water supply pipe line including installation and lift with other misc e/m works at office complex and mandakini complex at pcda (af) under ge clement town
Read moreConstruction of paved path and laying of water supply line from arnehar road back side of a-18 building to lp-02 hostel block at north campus of iit mandi
Construction of paved path and laying of water supply line from arnehar road back side of a-18 building to lp-02 hostel block at north campus of iit mandi
Read moreSpecial repair to ci di gi water supply pipe line from oht 11 to abdul hameed lines and other connected areas under ge utility ambala cantt
Special repair to ci di gi water supply pipe line from oht 11 to abdul hameed lines and other connected areas under ge utility ambala cantt
Read moreAddition alteration improvement of water supply distribution pipe lines system of 11 grenadiers and its connected areas in ambala cantt and addn altn to sub main and main sewage system of kota under ge utility ambala cantt
Addition alteration improvement of water supply distribution pipe lines system of 11 grenadiers and its connected areas in ambala cantt and addn altn to sub main and main sewage system of kota under ge utility ambala cantt
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbrsible motor pump ser including electrification work/installation complete and tee connection new pipe line to old distribution network at different location of under sub div
Read moreDrilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Drilling of 175 mm dia and 150 meter deep tubewell with installation of sumbersible motor pump including electrification work/installation complete and tee connection new pipe line to old distribution nerwork at different location under sub divis
Read moreof your Industry type