Tender Details

Particulars Details
Title
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Lembalakudi Fp At Km 57.317 On Trichy To Karaikudi Section From Km 54.800 To Km 91.054 (Design Kilometer) Of Nh 210 In Tamil Nadu
Description
Engagement Of User Fee Agency On The Basis Of Cb Through E Tender Lembalakudi Fp At Km 57.317 On Trichy To Karaikudi Section From Km 54.800 To Km 91.054 (Design Kilometer) Of Nh 210 In Tamil Nadu
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_211692_1
Reference
Number
NHAI/13013/547/CO/ 24-25/CB/Lembalakudi FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=252633
Start Date February 04, 2025 17:30
End Date

17/02/2025 ( Expired 142 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra

Read more
Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Consultancy services for rectification measures on mahadevpur to bhupalapally section 2lps of nh 353c from km 25.0 to 59.2 design ch. km.25.467 to 59.200 and dpr for parkal bypass, bhupalapally bypass on sironcha atmakur section of nh 353c

Read more
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu

Read more
Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Consultancy services for authoritys engineer for supervision of construction of 4 lane with ps idar-badoli bypass section from design chainage km 81.300 to 95.500 of nh-168g in the state of gujarat ,total length 14.2 km, on epc mode

Read more
Construction of 03 nos. of foot over bridge at km 141.150 sengodagoundenpudur, km 142.800 mudilipalayam pirivu and km.143.950 neelambur in the project stretch of chengapalli walayar section of nh-544 in the state of tamil nadu on epc mode

Construction of 03 nos. of foot over bridge at km 141.150 sengodagoundenpudur, km 142.800 mudilipalayam pirivu and km.143.950 neelambur in the project stretch of chengapalli walayar section of nh-544 in the state of tamil nadu on epc mode

Read more
Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Carrying out tests on completion and during mntnance pd using nsv, fwd, mbiu, retro-reflectometer etc for a-p rd section of nh-144a ex ch from km 85.385 to km 102.000 (design chainage km 74.350 to km 90.150) (pkg-iv) d in jk (ut) under 35 tf/(

Read more
Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Reconstruction of reengus rob destressed re wall lhs and strengthening of existing reengus rob rhs in jaipur-reengus sikar section of nh 52 from km 296.200 to 297.350 (total length 1150m) in the state of rajasthan on item rate (percentage) basis

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of thanjavur to perambalur section from km 6.000 to km 74.912 of nh-136 (old no. nh-226e) in the state of tamil nadu

Read more
Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Consultancy services for supervision consultants of operation and maintenance of two lane with paved shoulder of dindigul to nattham section from km 0.000 to km 38.000 of nh-383 in the state of tamil nadu

Read more
Major maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis

Major maintenance through strengthening overlay of the existing highway from km.103.050 (athur) to km.119.800 (salavathi) on tambaram to tindivanam section of nh-32 (nh-45) in the state of tamil nadu on item rate (percentage) basis

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise