Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tender For Procurement Of Fabrication Of Two Phase Natural Circulation Loop
|
| Description |
Tender For Procurement Of Fabrication Of Two Phase Natural Circulation Loop
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_IITJU_783856_1 |
|
Reference Number |
IITJMU/RC/SP-181/2023-24 |
| Tender Fee | 0 |
| EMD | 14000 |
| Tender Value | - |
| Place | IIT Jammu |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | December 05, 2023 19:30 |
| End Date |
Expired
06/01/2024
Expired 1009 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
33kv, 10ka single phase lightning arrestors (line type)
33kv, 10ka single phase lightning arrestors (line type)
Read moreTwo wheeler parking open space ngm006 at nagamangala bus stand
Two wheeler parking open space ngm006 at nagamangala bus stand
Read moreTwo wheeler parking open space kpp006 at koppa bus stand
Two wheeler parking open space kpp006 at koppa bus stand
Read moreProcurement of 3 phase 100 kva crgo/amorphous core type dtrs
Procurement of 3 phase 100 kva crgo/amorphous core type dtrs
Read moreProcurement of single phase energy meters at stpp, jaipur, mancherial, telangana.
Procurement of single phase energy meters at stpp, jaipur, mancherial, telangana.
Read moreManjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Manjeera water supply scheme phase-i and phase-ii under government budgetary support to hmwssb for implementation of project in a period of two years - refurbishment and up gradation of manjeera water supply duly constructing of new 232 mld water treatment plant with intake well and pump house, laying new 1700mm dia ms pipeline from kalabgoor wtp to patancheru pump house under transmission division no.ii, patancheru
Read moreLease hold shops for canara bank shops for a period of two years
Lease hold shops for canara bank shops for a period of two years
Read moreSupply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv swit
Supply of two 2(two) nos sf-6 gas circuit breakers, 245kv,3150a,3-phase, 50hz individual pole operated by a motor-wound spring-spring operating control mechanism along with galvanized steel support structures including adapter plate, inter-pole cables, terminal connectors, all the accessories, mandatory spares including design, manufacturing, testing, inspection at manufacturer works, packing and forwarding along with supervision of erection, testing and commissioning of breakers at 220kv switchyard of nagarjunasagar main power house, telangana
Read more03. tourism development of baba garib nath corridor in muzaffarpur district (phase-01).
03. tourism development of baba garib nath corridor in muzaffarpur district (phase-01).
Read moreOutsourcing of fabrication repairs (including material) of 80 kl water tankers of komatsu make working at ocp3 rg2 area.
Outsourcing of fabrication repairs (including material) of 80 kl water tankers of komatsu make working at ocp3 rg2 area.
Read moreof your Industry type