Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
[1]. Tab. Atorvastatine 10 Mg Ezetimibe 10 Mg In Strips., [2]. Tab. Atorvastatin 80 Mg In Strips., [3]. Tab. Rosuvastatine 5 Mg In Strips.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 106515035 |
Reference Number |
82246527 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106515035/viewNitPdf_4761745.pdf |
Start Date | November 01, 2024 22:35 |
End Date |
08/11/2024 ( Expired 243 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreRfp for upgradation (replacement/upgrade) and procurement of camc and fms of wsaps phase 1 project in state of rajasthan for 5 years based on open competitive bidding through e-procurement/ e-tender
Rfp for upgradation(replacement/upgrade) and procurement of comprehensive annual maintenance contract (camc) and fms of wsaps phase 1 project in state of rajasthan for 5 years based on open competitive bidding through e-procurement/ e-tender
Read morePrototype 1,prototype 2,prototype 3,prototype 4,prototype 5,prototype 6,prototype 7,prototype 8,pro
Read more
1 inch sch40s seamless hastelloy c 276 pipe,2 inch sch40s seamless hastelloy c 276 pipe,3 inch sch4
Read more
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreStrengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Strengthening of banur tepla road via surat manouli road (odr-42) in distt. sas nagar with 5 year maintenance (1 year defect liability period under head 5054 rb-10 roads)
Read moreDes, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Des, storage, cwe of suitable sitc of 5 mwp rooftop solar pv project including o and m of the project in resco model for a period of 25 years overdmrcs phase-iv network (part-ii) comprising of line-08 ext ,line-10 and rss.
Read moreof your Industry type