Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Road Kota Itawa Khatauli Shyopur (Sh 70) In Km. 58/0 To 70/0 And 94/0 To 96/500 Distt Kota (Job No. Crif / 1109 / Rj/ 2023 24)
|
Description |
Strengthening Of Road Kota Itawa Khatauli Shyopur (Sh 70) In Km. 58/0 To 70/0 And 94/0 To 96/500 Distt Kota (Job No. Crif / 1109 / Rj/ 2023 24)
|
Organisation | PWD - CE AND AS | State Govt. and UT |
Tender Id | 2024_CEPWD_409253_2 |
Reference Number |
ACE PWD ZONE KOTA NITNO-02-2024-25 |
Tender Fee | 12500 |
EMD | 28.7 Lakh |
Tender Value | |
Place | KOTA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=737117 |
Start Date | July 27, 2024 19:30 |
End Date |
13/08/2024 ( Expired 275 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).
Read moreImprovement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call
Improvement of road from laljuri to madhab bari l 3 00 km under ridf xxix of nabard job no tp com 180 2023 24 3rd call&#x0d
Read moreRehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Rehabilitation of bodhal bridge (at km 95.380) and chambal major bridge (at km 112.00) with widening of approaches from km 111/00 to km 111/864 on nh-552 ext. in the state of rajasthan (job no. nh-552 extn./rj/2024-25/856)
Read moreSpl repair to road and road furniture in aor of age b/r-iii under ge 969 ews job no i xii/02/spr road/stn hq uri/2024-25 and ii spl repair road/04/fy 24-25/rampur
Cwek/token-09/969 ews/2025-26 spl repair to road and road furniture in aor of age b/r-iii under ge 969 ews job no i xii/02/spr road/stn hq uri/2024-25 and ii spl repair road/04/fy 24-25/rampur
Read moreR/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
R/r damages on prem nagar chandog girdh sandrol road km 0/0 to 15/0 (sh- p/l gsb, g-iii and bc at rd 9/200 to 9/350 and seal coat in various rds damages due to disaster.
Read moreStrengthening and widening of road from bhadoti to bassi via lalsot toonga km 49/00 to 55/00 and 58/500 to 69/100 (sh-24)
Strengthening and widening of road from bhadoti to bassi via lalsot toonga km 49/00 to 55/00 and 58/500 to 69/100 (sh-24)
Read moreFdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Fdr to reconstruction of damaged, narrow pipe culverts from km 0/0 to 10/0 (12nos), construction of drain in kulaspur village limits from km 3/8-10 and strengthening of road in mullangi village limits from km 7/4-8 on mogpal to nh-44 (via) kanjar, kulaspur dichpally railway station road and lead road to kanjar from km 0/0 to 15/4 in nizamabad district (2nd call).
Read moreConstruction of ambulance road from chokhariya to dhar karewari in km. 0/00 to 1/925 in distt. shimla (hp) (sh construction of 900mm dia rcc hume pipe culverts at rd. 435
Construction of ambulance road from chokhariya to dhar karewari in km. 0/00 to 1/925 in distt. shimla (hp) (sh construction of 900mm dia rcc hume pipe culverts at rd. 435
Read moreAnnual maintenance plan for the year 2025-26 on barotiwala to gunai road in km. 0/00 to 19/120
Annual maintenance plan for the year 2025-26 on barotiwala to gunai road in km. 0/00 to 19/120.(sh pl renewal coat by providing 25mm thick bituminous concrete and thermoplastic edge line in km. 10/00 to 10/300)
Read moreC/o jeepable road to khawangi kanda 0/00 to 2/400 (sh-rofd,p/l soling, metalling and tarring from km 0/00 to 2/500)
C/o jeepable road to khawangi kanda 0/00 to 2/400 (sh-rofd,p/l soling, metalling and tarring from km 0/00 to 2/500)
Read moreof your Industry type