Tender Details

About Tender

🛢️ Bharat Petroleum Corporation Ltd (Bpcl) Is Seeking Proposals For The Integration Of Vhf Handsets At The Konadapalli Top Facility. 📡 🗓️ Proposal Submission Deadline: June 18, 2024, 12:00 Pm Bpcl, Under The Ministry Of Petroleum And Natural Gas, Invites Service Providers To Submit Detailed Proposals For The Supply And Integration Of Vhf Handsets. Keywords: Bharat Petroleum Corporation Ltd, Vhf Handsets, Supply Integration, Ministry Of Petroleum And Natural Gas, Proposal Submission
Particulars Details
Title
Custom Bid For Services Supply Integration Of Vhf Handsets At Bpcl Kondapalli Top
Description
Organisation Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas
Tender Id GEM/2024/B/5010091
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date June 04, 2024 17:10
End Date
Expired 18/06/2024

Expired 845 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Awarded Contractor / Winner

E. BIZ SOLUTION PRIVATE LIMITED.

Contract Value

548370

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 4 Lakhs Experience with Gov. Required: Years Project Experience Required: Yes
Buyer Name: Nithin Mohan
Ministry: Ministry Of Petroleum And Natural Gas
Department: Bharat Petroleum Corporation Ltd
Organisation: Bharat Petroleum Corporation Ltd

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 Airtel Communication 16-06-2024 14:09:56 Registered with designated Agency / Authority MSE Disqualified
2 E. BIZ SOLUTION PRIVATE LIMITED. 24-06-2024 16:48:29 Registered with designated Agency / Authority MSE Qualified
3 M/S VERTIKA ENTERPRISES 18-06-2024 11:44:31 Registered with designated Agency / Authority MSE Disqualified
4 SHEETAL WIRELESS TECHNOLOGIES PRIVATE LIMITED 25-06-2024 16:11:59 Offline upload N/A Qualified
5 WI-FI COMMUNICATIONS PRIVATE LIMITED 25-06-2024 12:53:43 Registered with designated Agency / Authority MSE Disqualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 E. BIZ SOLUTION PRIVATE LIMITED. Item Categories : Custom Bid for Services - SUPPLY INTEGRATION OF VHF HANDSETS AT BPCL KONDAPALLI TOP 548370.00 L1
2 SHEETAL WIRELESS TECHNOLOGIES PRIVATE LIMITED Item Categories : Custom Bid for Services - SUPPLY INTEGRATION OF VHF HANDSETS AT BPCL KONDAPALLI TOP 560500.00 L2

Ordered Items & Contract Pricing

Service Category Name Ordered Quantity Price
Custom Bid for Services - SUPPLY INTEGRATION OF VHF HANDSETS AT BPCL KONDAPALLI TOP Custom Bid for Services 1 ₹ 548370.000
Similar Tenders
Supply, installation, integration, testing and commissioning of various equipment at ranchi dairy as per technical specification of tender document.

Supply, installation, integration, testing and commissioning of various equipment at ranchi dairy as per technical specification of tender document.

Read more
Roof top rain water harvesting work for type-3 houses in chitrakoot district

Roof top rain water harvesting work for type-3 houses in chitrakoot district

Read more
Tender for design, development, customisation, implementation, integration, training, support and comprehensive annual maintenance of integrated business management and accounting software for mysore district hopcoms, mysuru

Tender for design, development, customisation, implementation, integration, training, support and comprehensive annual maintenance of integrated business management and accounting software for mysore district hopcoms, mysuru

Read more
Request for proposal (rfp) for selection of an agency for design, development, implementation, integration, operation & maintenance of a centralized command & control centre (ccc) infrastructure for wcdc

Request for proposal (rfp) for selection of an agency for design, development, implementation, integration, operation & maintenance of a centralized command & control centre (ccc) infrastructure for wcdc

Read more
Design, engineering and construction of entrance arch structure on nh 65 link road to zaheerabad industrial smart city consisting of all structural, architectural, electrical finishing works, ict systems along with integration, testing, commissioning, safety compliance and handover at nimz, zaheerabad.

Design, engineering and construction of entrance arch structure on nh 65 link road to zaheerabad industrial smart city consisting of all structural, architectural, electrical finishing works, ict systems along with integration, testing, commissioning, safety compliance and handover at nimz, zaheerabad.

Read more
Design, supply, installation, testing, commissioning, configuration, system integration, operations and maintenance of etc system on near arwal-sahar bridge towards arwal, on sh-81 at gopalpur near chandi, on sh-81 at medinipur near nasriganj, on sh-102 near piro in the state of bihar, ara chapra bridge in the state of bihar.

Design, supply, installation, testing, commissioning, configuration, system integration, operations and maintenance of etc system on near arwal-sahar bridge towards arwal, on sh-81 at gopalpur near chandi, on sh-81 at medinipur near nasriganj, on sh-102 near piro in the state of bihar, ara chapra bridge in the state of bihar.

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise