Tender Details

Particulars Details
Title
Construction Of Balanced Mechanised C C Lining In Km No 208 210 211 220 To 226 Of Kukadi Left Bank Canal
Description
Construction Of Balanced Mechanised C C Lining In Km No 208 210 211 220 To 226 Of Kukadi Left Bank Canal
Organisation CE-Water Resources Dept. Pune | State Govt. and UT
Tender Id 2024_CWRDP_1007348_1
Reference
Number
157/11
Tender Fee 5900
EMD 7.5 Lakh
Tender Value
Place Kolwadi
Link
View Original Tender Notice

https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1761739

Start Date February 22, 2024 15:30
End Date
Expired 13/03/2024

Expired 843 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Repairs to drain boundary wall fencing gates culvert etc in zone c area under age br (n) no i of ge (n) secunderabad

Repairs to drain boundary wall fencing gates culvert etc in zone c area under age br (n) no i of ge (n) secunderabad

Read more
Construction of drainage work in kh. no. 437 to 440, 449 to 453 rev. village titardi. 2302

Construction of drainage work in kh. no. 437 to 440, 449 to 453 rev. village titardi. 2302

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat

Construction of rcc drain in ward no. 33 gaykhuri basti to hanuman mandir at nagar palika parishad balaghat

Read more
Replacement of 250mm dia old/damaged sewer lines by p/l 400mm dia dwc hdpe pipe h no.2894 ram nagar to aggarwal sweets at mandoli road in ward no-223 in rohtash nagar ac-64 under ee (c)-05

Replacement of 250mm dia old/damaged sewer lines by p/l 400mm dia dwc hdpe pipe h no.2894 ram nagar to aggarwal sweets at mandoli road in ward no-223 in rohtash nagar ac-64 under ee (c)-05

Read more
Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, (length - 27.00 km)

Balance work for construction of road from l034 kundradhan to mamankot upper, package no. jk14-567, regular pmgsy (batch-i, 2017-18), stage-i, block mahore, district reasi, &#x0d (length - 27.00 km)&#x0d

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise