Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Ytps
|
| Description |
Tggenco Ytps(5 X800 Mw) Providing 1 No Bus With A
Seating Capacity Of 40 For A Mileage Of 9000km/Month And
Usage Time Of 24hrs/Day On Hire Basis For The Official Use
Of Engineers For Attending Shift Duties At Ytps,
Veerlapalem(v), Dameracherla(m), Nalgonda For The
Perod From 01.04.2025 Or Actual Date Of Utilization To
31.03.2026
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 596838 |
|
Reference Number |
e- 03/ SE/EM/Stage-I /YTPS/2025-26 |
| Tender Fee | 1507 |
| EMD | 63815 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 16, 2025 16:30 |
| End Date |
Expired
19/05/2025
Expired 516 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tggenco-(5x800mw) ytps-providing plantation in the area between ash pond and tungapadu vagu (part-i) on the d/s of ash pond at (5x800mw) yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Tggenco-(5x800mw) ytps-providing plantation in the area between ash pond and tungapadu vagu (part-i) on the d/s of ash pond at (5x800mw) yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Read moreTggenco-(5x800 mw) ytps - procurement of furniture for ce, se, des, ades and aes offices of stage-i, service building of yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Tggenco-(5x800 mw) ytps - procurement of furniture for ce, se, des, ades and aes offices of stage-i, service building of yadadri thermal power station, veerlapalem (v), dameracherla (m), nalgonda dist.
Read moreTggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Tggenco (5x800mw) ytps scc circle stage-i carrying out stage-i unit-1 and 2 water and steam sample collection, bringing the samples to the laboratory , topping up of chemical dosing tanks, cpu regeneration plant works and dm plant works etc for the period from 01.10.2026 or from the date of commencement of work to 31.03.2027 for the fy 2026-27 of ytps (5x800mw), veerlapalem(v), dameracherla (m), nalgonda(d).
Read moreof your Industry type