Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Drainage Extension On Kollam Mchukunn Akalappuzha Thikkodi Beach Road From Ch 10050 To 10165 Lhs Reconstruction And New Drain Construction In Koyilandy Constitution General Civil Work
|
| Description |
Dismantling Structures Excavation Backfilling Construction Of Foundations Drainage Beds Rcc Drains Cover Slabs Side Walls And Reinforcement Bar
|
| Organisation | PWD | State Govt. and UT |
| Tender Id | 2025_PWD_794220_1 |
|
Reference Number |
D2/TN/05/2025-2026 |
| Tender Fee | 2000 |
| EMD | 22651 |
| Tender Value | |
| Place | Koyilandy |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1312341 |
| Start Date | September 03, 2025 19:30 |
| End Date |
Expired
12/09/2025
Expired 309 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreGeneral drainage extention on kollam muchukunn akalappuzha thikkodi beach road construction of drainage on kollam muchukunn akalappuzha - thikkodi beach road ch 8840 too 9000 general civil work
General drainage extention on kollam muchukunn akalappuzha thikkodi beach road construction of drainage on kollam muchukunn akalappuzha - thikkodi beach road ch 8840 too 9000 general civil work
Read moreConstruction of new drain on kollam muchukunnu akalappuzha thikkodi beach road from ch 0_390 to 0_510 lhsin koyilandy constituency general civil work
The project involves constructing a new drain on kollam muchukunnu akalappuzha thikkodi beach road from chainage 0_390 to 0_510. it includes m15 grade pcc side walls and m20 grade rcc cover slabs to address water stagnation and improve road safety.
Read moreConstruction of new drain on kollam muchukunnu akalappuzha thikkodi beach road after nh bypass crossing from ch 0_570 to 0_660 in koyilandy constituency general civil work
Providing drainage with m15 grade pcc side walls and m20 grade rcc cover slabs to address water stagnation and pr road collapse on kollam muchukunnu akalappuzha thikkodi beach road.
Read moreDrainage extension on vanmugam keezhur road ch 2 830 to 2 880 rhs and kollam muchukunnu akalappuzha thikkodi beach road from ch 8 850 to ch 9 200 rhs under koyilandy roads section
Drainage extension on vanmugam keezhur road ch 2 830 to 2 880 rhs and kollam muchukunnu akalappuzha thikkodi beach road from ch 8 850 to ch 9 200 rhs under koyilandy roads section
Read moreSr 2024 25 reconstruction of drainage on kollam muchukunn akalappuzha thikkodi beach road reconstruction of culvert amp drainage between ch 10 150 10 350
&#x0d sr 2024 25 reconstruction of&#x0d drainage on kollam muchukunn akalappuzha&#x0d thikkodi beach road reconstruction of culvert&#x0d amp drainage between ch 10 150 10 350&#x0d
Read moreConstruction of drainage and cross drainage on payyoli - perambra road new drainage and cd works on payyoli perambra road ch between 1400 to 1530 rhs general civil work
Construction of drainage and&#x0d cross drainage on payyoli - perambra road new&#x0d drainage and cd works on payyoli &#x0d perambra road ch between 1400 to 1530 rhs&#x0d general civil work
Read moreConstruction of cc road and main drain work for paam beach road in pen municipal council area (ch 160 to ch 390)
Construction of cc road and main drain work for paam beach road in pen municipal council area (ch 160 to ch 390)
Read moreof your Industry type