Tender Details
Particulars | Details |
---|---|
Title |
A.R And M.O On Nh.305 Sainj Luhri Aut Road Km 0.00 To 97.00 .Sh. Construction Of Edge Wall In Pcc For Approach Road And Construction Of Pcc Dirt Wall On Both Ends Of Manglour Bridge At Rd 79.875 Under Nh Sub Division Banjar.
|
Description |
A.R And M.O On Nh.305 Sainj Luhri Aut Road Km 0.00 To 97.00 .Sh. Construction Of Edge Wall In Pcc For Approach Road And Construction Of Pcc Dirt Wall On Both Ends Of Manglour Bridge At Rd 79.875 Under Nh Sub Division Banjar.
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 350 |
EMD | 11000 |
Tender Value | |
Place | Rampur |
Link |
AAAAAAAAAA Login to view |
Start Date | May 24, 2025 00:25 |
End Date |
02/06/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreConstruction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Construction of 30 mtr span bridge (2 span 15 mtr each) over makhanwindi drain at rd 2.975 on link road apk road to nh-15 to talwandi dasonda singh (mrl 01) (under pmgsy-iii, batch-i) year 2024-25, block majitha, distt. amritsar. package no. pb01158a
Read moreConstruction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Construction of rcc foot bridge over garai river to connect village of naramohan para and panchayat office under hezamara rd block, sh- construction of approach road with 80mm thick paver block.
Read moreA.r and m.o on nh.305 sainj luhri aut road km 0.00 to 97.00 .sh. construction of edge wall in pcc for approach road and construction of pcc dirt wall on both ends of manglour bridge at rd 79.875 under nh sub division banjar.
A.r and m.o on nh.305 sainj luhri aut road km 0.00 to 97.00 .sh. construction of edge wall in pcc for approach road and construction of pcc dirt wall on both ends of manglour bridge at rd 79.875 under nh sub division banjar.
Read moreO.r on kalka shimla wangtoo road nh 05 km 167.00 to 236.000 sh c.o pcc b.wall between rd 167.170 to 167.215 anongwith gabion wall and u shape pcc drain at km 167.170 to 167.250 and 167.260 to 167.300 below fagu rest house
O.r on kalka shimla wangtoo road nh 05 km 167.00 to 236.000 sh c.o pcc b.wall between rd 167.170 to 167.215 anongwith gabion wall and u shape pcc drain at km 167.170 to 167.250 and 167.260 to 167.300 below fagu rest house
Read moreRepair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50
Repair of restoration of rain damage on link road from ther to village chandrehar in g.p ther under sdrf deposit work sh construction of pcc retaining wall at rd. 0.710 to 0.721.50
Read moreConstruction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h - construction of 19.75 metre span rcc t-beam bridge including both side approaches
Construction of 19.75 metre span rcc t-beam bridge over lal ghar nallah on sambhar lahar thatri road at rd 3/450 in district kangra hp s/h- construction of 19.75 metre span rcc t-beam bridge including both side approaches
Read moreConstruction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Construction of brick wall around both sides of lift entrance on fobs at munirka, ullan batter marg, rtr marg, outer ring road moti lal nehru camp, dwarka approach road under pwd division south west road-i under sub division-i new delhi.
Read moreRestoration of rain damages on nh 305 sainj luhri aut road km 0/00 to 97/00 sh. construction of breast wall in random rubble masonry at rd 73/030 to 73/045.
Restoration of rain damages on nh 305 sainj luhri aut road km 0/00 to 97/00 sh. construction of breast wall in random rubble masonry at rd 73/030 to 73/045.
Read moreof your Industry type