Tender Details

Particulars Details
Title
Supply And Carriage Of Pea Gravel 2.00 Mm To 3.35 Mm Size From Lalkuwan To Pipiganj Store Dist Gorakhpur Tubewell Construction Division Gorakhpur
Description
Supply And Carriage Of Pea Gravel 2.00 Mm To 3.35 Mm Size From Lalkuwan To Pipiganj Store Dist Gorakhpur Tubewell Construction Division Gorakhpur
Organisation U P Irrigation Department (Mechanical) | State Govt. and UT
Tender Id 2025_UPIDM_1036671_1
Reference
Number
578/EETCDGKP/ DT 03-05-2025
Tender Fee 854
EMD 58960
Tender Value
Place PIPIGANJ STORE DIST- GORAKHPUR TUBEWELL CONSTRUCTI
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1878187
Start Date May 14, 2025 17:30
End Date

21/05/2025 ( Expired 2 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Construction of toll plaza at ch.11.800 near karanja ramjanpur on shegaon to deori phata from km 0.000 to km 41.500 section of nh 548 c in the state of maharashtra on risk and cost of contractor.(2nd call)

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation

Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25

Periodical renewal of pmgsy handed over road from mandwi to chachu bazaar (t01) (l 9.533 km) (package no. tr-01 199 u) under the performance incentive of pmgsy under mandwi pwd(r and b) sub division, mandwi block during the year 2024-25

Read more
Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Widening of existing culvert and construction of new culvert on nh-09(old nh-125) from km- 121.700 to 129.450 (champawat aabadi portion), km 136.320 to km 142.00 (lohaghat aabadi portion), km 197.150 to km 202.00 (pithoragarh aabadi portion), in the

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise