Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Supply And Carriage Of Pea Gravel 2.00mm To 3.35mm Size From Lalkuwan To Munderwa Store Basti, Tubewell Construction Division Gorakhpur.
|
Description |
Supply And Carriage Of Pea Gravel 2.00mm To 3.35mm Size From Lalkuwan To Munderwa Store Basti, Tubewell Construction Division Gorakhpur.
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPIDM_849500_1 |
Reference Number |
989/TCDGKP/ DT 07-10-2023 |
Tender Fee | 854 |
EMD | 52728 |
Tender Value | |
Place | EE TCD OFFICE GORAKHPUR |
Link | https://etender.up.nic.in |
Start Date | October 16, 2023 17:30 |
End Date |
25/10/2023 ( Expired 612 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreConsultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap
Read moreAbilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Abilitation upgradation and widening of akola to mahan section from km 35.265 to km 64.574 (length 29.309 km) including construction of 4 lane with paved shoulder configuration of barshi takli bypass (length 3.160 km) on nh161a the state of maharas
Read moreUp-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Up-gradation and construction to 2l with ps of chanderi-pichhore road section of nh-346, from design km 237.600 to km 292.750 (design length-55.150 chanderi link bypass) in the state of madhya pradesh
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreWork of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Work of installation , erection , dismantling of 1x10 mvar capacitor bank unit and carriage of capacitor bank from 400/132 kv s/s sector-123, noida to 132/33 kv s/s rudrapur and other associated work at 132 kv s/s rudrapur under etd, deoria
Read moreDesign, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system (except tetra system) of line 9 (from dahisar east to rai) and 7a (andheri east to csmia) corridor of mumbai metro including dongri depot.
Read moreManufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Manufacture testing supply and delivery of different type various clampconnectors and hardware fittings for works related to augmentation of 220kv main bus from twin acsr zebra to twin acsr moose conductor and allied works at kasba 220kv ss
Read moreZone-03, ward-10, construction of cc road and rcc drain from beside of ramadhar tripathi ji house to kanha park.
Zone-03, ward-10, construction of cc road and rcc drain from beside of ramadhar tripathi ji house to kanha park.
Read moreof your Industry type