Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Preparation Of Tekla 3 D Model And Fabrication Drawings Of Steel Structures.
|
Description |
Preparation Of Tekla 3 D Model And Fabrication Drawings Of Steel Structures.
|
Organisation | The Fertilisers And Chemicals Travancore Ltd. | Central Govt. Ministry/Department |
Tender Id | 2025_FACT_857539_1 |
Reference Number |
08004/2025-2026/E31402 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | FEDO, Udyogamandal |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=901563 |
Start Date | April 23, 2025 22:50 |
End Date |
08/05/2025 ( Expired 44 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme
Supply, installation, testing and commissioning of digital subtraction angiography system (single plane cardio vascular catheterization and digital subtraction angiography laboratory high end 3d) 01 no. on turnkey and buy-back basis for the departme
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreSupply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Supply, fabrication and erection of ss304l and carbon steel piping in block 1 and 2 of frp, frfcf
Read moreConsultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Consultancy services for preparation of dpr for widening to 4lane from km 35.00 to km 66.275 from nalagarh to swarghat of nh 105 and spur in the state of hp.
Read moreCs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Cs for preparation of dpr for upgradation of 4lane tada nellore sec of nh16 (km. 54.383 to km. 165.183/km.1383.713) and 4lane nellore bypass (km. 1366.547 to km.1383.713) (total 127.966 km) to 6lane configuration in the state of andhra pradesh
Read moreSupply, fabrication, installation and testing of off-gas piping for out-cell at wmp, frfcf
Supply, fabrication, installation and testing of off-gas piping for out-cell at wmp, frfcf
Read moreConsultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Consultancy services for pre-construction activities and preparation of detailed project report for development of 2 lane alternate route to bypass dabarkot landslide zone (from km 75.950 to km 80.750) on nh-134 in the state of uttarakhand
Read moreof your Industry type