Tender Details
Particulars | Details |
---|---|
Title |
Sw I:Gudur Vijayawada Section: (I) Ctr(p) 2.463 Km At Km295.943 298.406 On Dn Line, (Ii)trr(p) 50.608 Km At Various Locations On Up &Amp Dn Lines And (Iii) Tsr(p) 11.835 Km At Various Location On Up Line Between Gudur Kadavakuduru(excl) Stations Of Sr.Den/South/Bza Jurisdiction. Sw Ii:Gudur Vijayawada Section: (I) Ctr(s) 7.517 Km At Various Locations On Loop Lines, (Ii)trr(s) 0.762 Km At Krv Dn Loop Line And (Iii) Tsr(s) 1.099 Km At Anb Up Loop Line Between Gudur Kadavakuduru(exc
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77343230 |
Reference Number |
E-25-south-2024 |
Tender Fee | 0 |
EMD | 5.1 Lakh |
Tender Value | |
Place | Secunderabad |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77343230/viewNitPdf_4710864.pdf |
Start Date | September 16, 2024 23:38 |
End Date |
09/10/2024 ( Expired 194 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supplying, installation, testing and commissioning of various capacity on line ups and circuit wiring at directorate of social welfare at goalghar under section iii of sub division ii, workshop division, a.p.w.d, port blair
Supplying, installation, testing and commissioning of various capacity on line ups and circuit wiring at directorate of social welfare at goalghar under section iii of sub division ii, workshop division, a.p.w.d, port blair
Read moreThrough rail renewal (primary) along with tfr of existing 60 kg 90 uts rails laid on psc-14 sleeper with new 60 kg 90uts/r260 rails (lwr) for barajamda jn - gua - trr(p) - 4.500 tkm, padapahar - bolanikhadan - trr(p) - 5.500 tkm & padapahar - nayagarh - trr(p) - 28.112 tkm. and 1.595 tr. km on up line at km 331.00 - 332.595 between jnk-tabu section under the jurisdiction of sr.den(south)/ckp.
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read more1) vpy-wst section up line: ctr (p) -0.853 km & trr (p) on br. no. 10 r & 16 r -0.047 km 2) ctr(p)-vlk-anng -3.616 km with 60kg /psc/1660 nos/km between km. 0-3.616 in single line
For complete deion and other details, please refer to tender
Read moreI -ms - vm section : through fitting renewal for a length of 63.860 km from km. 59.84 - 80.0, km. 98.00 - 124.30, km. 124.30 - 124.75, km. 125.95 -142.90 on up line. ii - ms-vm section-ctr(s) - 1.451 km with 60kg (cl.ii) /psc (cl.ii)/1540 nos/km on loop lines gsn station stabling line no.3 - 0.768 km & stabling line no. 4 -0.683 km.
For complete deion and other details, please refer to tender
Read moreS&t work in connection with:- (a) mldt division tph-rjl sl trr(p)= 1.29 km & trrp bgp-jmp up 305.112-305.621 = 0.509 km, (b) tinpahar - rajmahal (sl) - tsr(p) - 3.000 tkm, (c) tfr- sl 97.4-114.37=18.97 km in section of mdle-dumka and trr(p) 0.580km in section of bhle-baka, (d) new farakka - malda (up & dn) - tsr(p) - 4.252 tkm, (e) new farakka - malda town (dn) - trr(p) - 0.500 tkm, (f) malda division - ctr(s) - 51.750 tkm, (g) malda division - trr(s) -14.976 tkm, (h) jamalpur - ki
For complete deion and other details, please refer to tender
Read moreSw-i- manmad - mudkhed (up/dn) - cess repair - 86700 cum & akola - purna - cess repair - 40000 cum( irpsm id-11.0.31.24.3.53.010 pb no. 157 of fy 2024-25) sw-ii - nanded division - manmad-mudkhed (up& sl) section : ctr(p) of exg. 60kg/90uts rails on psc6 sleepers 1660nos/km density with new 60kg r260 grade rails (lwr) on new wider psc sleepers 1660 nos./km including recoupment and increasing of ballast cushion to 35 cm. and deep screening of ballast for a total length of 15.317 km. (sa
For complete deion and other details, please refer to tender
Read moreRajkot division- signalling work in connection with engineering work (1)rajkot - okha - ctr(p) - 11.568 tkm, trr (p) - 22.212 tkm and tsr (p) - 26.80 tkm.(2)kanalus-sikka-trr (s)-1.550tkm & rjt-okha-trr(s)-9.131tkm (total-10.681tkm).(3)sunr-rjt(dn)-ctr(p)-9.793tkm, trr(p)-10.614tkm & tsr(p)-3.750 tkm.(4)rjt div-ttr(cscmsc)-19 sets.(5) rjt div-tbr 58.379 tkm(tl),tbr 4.278 tkm(loop line) & tbr of 24 nos (p&c).
For complete deion and other details, please refer to tender
Read moreCtr(p) work between dum dum junction -petrapole section at km. 54.323-54.342, 54.356-54.862, 56.75-56.758, 56.764-56.77, 57.543-57.85, 62.10-63.050, 66.173-66.510, 10.836-15.034 on dn line and 10.636-13.034,17.953-18.0 on up line ( total =9.607 tkm) under jurisdiction of assistant engineer /barasat along with other ancillary work .
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreof your Industry type