Tender Details
Particulars | Details |
---|---|
Title |
Fabrication And Erection Of A) Paddle Separator Of Unit No. 207 Trunnion Pin 08 Nos. And Trunnion Bush 08 Nos. And Changing Of Hanging Rubber Flap And Er Weight 16 Nos. B)bath Liner Plate Of Unit No. 205 At 13 Mtr Level In Hms Section At Kathara
|
Description |
Fabrication And Erection Of A) Paddle Separator Of Unit No. 207 Trunnion Pin 08 Nos. And Trunnion Bush 08 Nos. And Changing Of Hanging Rubber Flap And Er Weight 16 Nos. B)bath Liner Plate Of Unit No. 205 At 13 Mtr Level In Hms Section At Kathara
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_312478_1 |
Reference Number |
PO/KTW/EnM/eTen/24-25/48 Dated-12.07.2024 |
Tender Fee | 0 |
EMD | 3000 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=323830 |
Start Date | July 13, 2024 16:30 |
End Date |
23/07/2024 ( Expired 294 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing and changing of (03 nos.) helical coil springs, rope, thimble, wire clamp, d cycle, spring, cover plate and adjusting spindle etc. of hanging screen unit no. 203, 204 and 247 at hms section of kathara washery
Repairing and changing of (03 nos.) helical coil springs, rope, thimble, wire clamp, d cycle, spring, cover plate and adjusting spindle etc. of hanging screen unit no. 203, 204 and 247 at hms section of kathara washery
Read moreA)repairing of roller frame (24 nos.) of belt conveyor size 1000 mm of unit no. 248 b/c (length-30mtrs) and b)repairing of roller frame (25 nos.) of belt conveyor size 1000 mm of unit no. 267 b/c (length-32mtrs) in hms section of kathara washery
A)repairing of roller frame (24 nos.) of belt conveyor size 1000 mm of unit no. 248 b/c (length-30mtrs) and b)repairing of roller frame (25 nos.) of belt conveyor size 1000 mm of unit no. 267 b/c (length-32mtrs) in hms section of kathara washery
Read moreFabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Fabrication and erection of discharge chute with side guard and its channel, angle and plate etc of unit no. 52 complete dismantling and fitting in rcb section at kathara washery
Read moreRepair and dismantling of old motor and base, fabrication and erection of new motor and base fitting and assembly etc. of unit. no. 929 and 931 in rlb section of kathara washery
Repair and dismantling of old motor and base, fabrication and erection of new motor and base fitting and assembly etc. of unit. no. 929 and 931 in rlb section of kathara washery
Read moreRepairing of 02 nos. a frame bearing , repairing by eye making as per pin size, bush fitment, plate fitment, fabrication of 04 nos. of steel tube and differential arm of cat777d dumper sl. no. th-11 th-12 at ashok ocp.
Repairing of 02 nos. a frame bearing , repairing by eye making as per pin size, bush fitment, plate fitment, fabrication of 04 nos. of steel tube and differential arm of cat777d dumper sl. no. th-11 th-12 at ashok ocp.
Read moreFabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery
Fabrication and erection of receiving chute liner plate, horizontal plate and side plate of unit no. 202 after dismantling the same at 17 mtr level in hms section of kathara washery
Read moreReplacement of worn out mother as well as liner plates of discharge chute of unit no. 913-1,2,and 3and launder of 913-3, erection and fabrication of pipes, cyclone and block pannels etc. of the unit no. 913-3 at ps-9 section at madhuban coal washery
Replacement of worn out mother as well as liner plates of discharge chute of unit no. 913-1,2,and 3and launder of 913-3, erection and fabrication of pipes, cyclone and block pannels etc. of the unit no. 913-3 at ps-9 section at madhuban coal washery
Read moreRepair, fabrication and erection including new making of cross member no. 03, 04 and 05 of unit no. 949 and 950 in rlb section of kathara washery
Repair, fabrication and erection including new making of cross member no. 03, 04 and 05 of unit no. 949 and 950 in rlb section of kathara washery
Read moreComplete repairing and overhauling of 04 nos. bearing housing assly. usl vibrating screen unit no. 218b1b2 and 04 nos. er mass dead weight with shaft of vibrating screen unit no, 221a1a2 of main plant of kedla washery
Complete repairing and overhauling of 04 nos. bearing housing assly. usl vibrating screen unit no. 218b1b2 and 04 nos. er mass dead weight with shaft of vibrating screen unit no, 221a1a2 of main plant of kedla washery
Read moreof your Industry type