Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification Works In Hpt
|
| Description |
Rectification Works In Hpt
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_518675_1 |
|
Reference Number |
CE NCTPS II SE M II O M 150 24 25 |
| Tender Fee | 0 |
| EMD | 18200 |
| Tender Value | - |
| Place | SE MECH II NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=617222 |
| Start Date | January 13, 2025 20:05 |
| End Date |
Expired
27/01/2025
Expired 627 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares for hpt assembly fixtures 210 mw kwu turbine
Spares for hpt assembly fixtures 210 mw kwu turbine
Read moreServicing and defect rectification of bus, truck and ciaz
Servicing and defect rectification of bus, truck and ciaz
Read moreRectification of pot holes with patch work in edanganasalai municipality
Rectification of pot holes with patch work in edanganasalai municipality
Read moreRectification/straightening of leaning ohe mast/structure under kgp division.
Rectification/straightening of leaning ohe mast/structure under kgp division.
Read moreTtps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Ttps mechii tm i unitiii inspection overhauling of hpt ipt control valves cam shaft assemblies and turbine bearings during the forthcoming annual overhaul
Read moreReplacement and rectification of faulty ofc cable beween tatanagar-badampahar section.
Replacement and rectification of faulty ofc cable beween tatanagar-badampahar section.
Read moreRepair, rectification and waterproofing of township utility buildings at brbnmpl, salboni
Repair, rectification and waterproofing of township utility buildings at brbnmpl, salboni
Read moreRectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Rectification of gear coupling and rectification of loop-take-up unit and changing old vcb, starter of 4d belt in rvi seam of mic, jhanjra project colliery.
Read moreShifting and opening of wooden packets with mechanical tools and assistance in making shortage or damage inventory of all the received transmitter at hpt site stok, leh ladakh.,packing of spare items after verification of transmitter material or equipments in packages in transmitter building at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for transmitter rack unit 02nos and rf changeover switch as per details at hpt stok, leh ladakh,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dummy load as per details at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dehydrator as per details at hpt site stok, leh ladakh.,installation of 05kw 1 plus 1 fm transmitter and accessories as per due care and consultation with engineer incharge or installation officer at hpt site stok, leh ladakh.,in
Shifting and opening of wooden packets with mechanical tools and assistance in making shortage or damage inventory of all the received transmitter at hpt site stok, leh ladakh.,packing of spare items after verification of transmitter material or equipments in packages in transmitter building at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for transmitter rack unit 02nos and rf changeover switch as per details at hpt stok, leh ladakh,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dummy load as per details at hpt site stok, leh ladakh.,providing, fabrication and fixing of ss frame as per complete in all respect including primer and paint for dehydrator as per details at hpt site stok, leh ladakh.,installation of 05kw 1 plus 1 fm transmitter and accessories as per due care and consultation with engineer incharge or installation officer at hpt site stok, leh ladakh.,in
Read moreof your Industry type