Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Mpm Unit I Mill 1 A To 1 J Replacement Rectification Of Hot
|
| Description |
Nctps Ii Mi Circle Mpm Unit I Mill 1 A To 1 J Replacement Rectification Of Hot
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_460842_1 |
|
Reference Number |
SE MI NCTPS II O M 147 24 25 |
| Tender Fee | 0 |
| EMD | 6900 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=547770 |
| Start Date | July 06, 2024 14:30 |
| End Date |
Expired
22/07/2024
Expired 816 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Nctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreTtps operation circle mpm ii unit iv attending repair works in journal door assembly and mill body of mills
Ttps operation circle mpm ii unit iv attending repair works in journal door assembly and mill body of mills
Read moreTtps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Ttps operation circle mpm ii unit iv renewal of badly eroded area of one portion of each mill separator body in mill 4a, 4b and 4d
Read moreTtps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Ttps operation circle mpm ii unit v renewal of badly eroded area of one portion of each mill separator body in mill 5b, 5c, 5d and 5e
Read moreNctps i es circle em i division s dn iii esp hot oil circulation of 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer and replacement of gaskets for in unit ii at nctps i
Nctps i es circle em i division s dn iii esp hot oil circulation of 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer and replacement of gaskets for in unit ii at nctps i
Read moreNctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Nctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Read moreTtps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Ttps operation circle mpm ii unit iv and v mill gear box inspection complete overhauling and reassembling of gear box in unit iv and v hp 803 bowl mills during breakdown of gear box
Read moreBi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Bi-annual rate contract for u4 b and a equipment maintenance,u3-6 btl rectification job, u3 and 4 mill overhauling and gear box replacement job for ktps
Read moreTtps operation circle mpm ii ac plant rectification of vibration in blower impeller fan assembly by renewing of impeller fan blades the rod and blower casing cover and commissioning of the blower a at air washer unit iv model no 13.5 lld
Ttps operation circle mpm ii ac plant rectification of vibration in blower impeller fan assembly by renewing of impeller fan blades the rod and blower casing cover and commissioning of the blower a at air washer unit iv model no 13.5 lld
Read moreTtps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Ttps operation circle cad acwph unit ii dismantling and replacement of wornout, 600 nb ms pipes in bearing cooling water return line of unit ii acw system with new 600 nb ms seamless pipes thickness 9.53 mm astm sa106 gr c pipes near mill plant area
Read moreof your Industry type