Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Invitation For Bids: Supply, Installation, Testing & Commissioning Of Poles With Accessories 🌟 The Delhi Development Authority (Dda), Under The Aegis Of The Central Government's Ministry Of Housing And Urban Affairs, Invites Bids For The Completion Of Schemes Under Nazul Act Ii, Specifically For The Supply, Installation, Testing, And Commissioning Of Poles With Accessories At Kali Basti Road, Uttam Nagar, And Bakkarwala. 📅 Bid Submission Deadline: April 29, 2024, 3:00 Pm The Tender Fee Is Inr 0, With An Earnest Money Deposit (Emd) Of Inr 11,421. Interested Bidders Should Review The Detailed Tender Document Ee(e)/Eld 10/Dda For Comprehensive Project Specifications And Submission Guidelines. Keywords: Dda, Poles With Accessories, Nazul Act Ii, Swz, Street Lighting, Government Tender, Bid Submission, EmdParticulars | Details |
---|---|
Title |
Sitc Of Poles With Accessories At Different Locations Kali Basti Road Uttam Nagar And Bakkarwala
|
Description |
M O Completed Schemes Under Nazul A C Ii Under Swz
|
Organisation | Delhi Development Authority | Central Govt. Ministry/Department |
Tender Id | 2024_DDA_804467_1 |
Reference Number |
01/EE(E)/ELD-10/DDA/2024-25 |
Tender Fee | 0 |
EMD | 11421 |
Tender Value | |
Place | EE(E)/ELD-10/DDA |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=845572 |
Start Date | April 20, 2024 19:55 |
End Date |
29/04/2024 ( Expired 414 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping s at ooty lake and yercaud lake (package-1) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreJp/b862-000-eb-t-0020/1021 - 220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
220 kv gas insulated substation package for pdh-pp plant with ethane and propane storage and handling facilities at dahej, gujarat of m/s petronet lng limited (pll)
Read moreLong-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Long-term rectification of morth identified blackspots by (i) construction of 6 lane vup (1x20mx5.5m) at cmc junction tg-04-11. (ii) construction of service road along with foot over bridge near govt. junior college, sadashivnagar tg-04-18 on nag-hyd
Read moreof your Industry type