Development of roads from 17 Tilla to Birendra Tripura Para and Raimohan Dutta para anganwaadi center to PMGSY Road (L0-30-31) Annada das para(Manu Bazar to Alshya Bazar)
Chief Engineer, PWD (R and B) | SE, PWD (R and B), Third Circle | EE Santirbazar Division · Tripura
- Tender value
- ₹44.16 Lakh
- EMD
- ₹88,321
- Tender fee
- ₹1,000
This tender closed on 15 Oct 2026.
Tender details
SH-WBM-III, Prime Coat, Tack Coat, Carpeting,Re-Carpeting, Seal Coat and Paver Block etc.
- Tender ID
- 2026_CEPWD_77959_1
- Reference number
- 155/NIT/SE-III/R/PWD( Rand B)/2026-27
- Organisation
- Chief Engineer, PWD (R and B) | SE, PWD (R and B), Third Circle | EE Santirbazar Division
- Location
- Tripura
- Bids open
- 9 Oct 2026, 4:00 PM
- Bids close
- 15 Oct 2026, 3:00 PM
- Tender value
- ₹44.16 Lakh
- EMD
- ₹88,321
- Tender fee
- ₹1,000
Source: https://tripuratenders.gov.in/nicgep/app?page=Home&service=page
Bid on the next development of roads from 17 Tilla tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
Similar tenders
-
Mtc of Road From Raimohan Dutta para anganwadi centre to PMGSY Road Annada das para
SH- WBM- III, Repairs of potholes ,Carpeting , Recarpeting, seal coatpucca drain etc.
Chief Engineer, PWD (R and B) | State Govt. and UT · Santirbazar, South Tripura Closed 29 Jul 2025
View tender -
Mtc. Of road from Manu Bazar - Alashya Bazar to Durgarai Para
Repairs to road by WBM-III, Re-Carpeting, Repairs of Potholes, Road side drain, CD Culvert
Government of Tripura · O/o the Executive Engr.,PWD (R and B),Santirbazar Closed 30 Oct 2023
View tender -
Mtc. of road from Manu-Srinagar road to Sankar Tilla via Kaladepha Nalsing Sardar para, Debendra para (L-10.00 km)
SH- Patch metalling, patch-carpeting and seal coat etc. during the year 2023-24. (Portion from 3.00 km to 4.50 km). Group- II. (2nd Call)
Government of Tripura · Executive Engineer, PWD (RandB), Sabroom Division Closed 15 Sep 2023
View tender -
Mtc. of road from Manu Bazar to Holly Cross via Panchayat Para
Patch Repairs, Re-Carpeting, Pucca Drain etc. during the year 2023-2024.
Government of Tripura · O/o the Executive Engr.,PWD (R and B),Santirbazar Closed 12 Sep 2023
View tender -
FDR/Mtc. of road from Manu-Srinagar Road (Near Ashram tilla) to Buddimangal para under Satchand RD Block
SH - Erection of bailey bridge over river local Cherra on road from Manu-Srinagar Road (Near Ashram tilla) to Buddimangal para at ch. 0.300km.
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Sub-Division Closed 17 Sep 2024
View tender -
FDR/Mtc. of road from Manu-Srinagar Road to Sankar Tilla via Kaladepha, Nalsing Sardar Para, Debendra Para under Satchand Block (L- 6.80 Km)
S.H. -Patch Metalling, Re-Carpeting and Seal coat etc. during the year 2024- 25. (Portion from ch. 0.00 km to ch. 1.330 km). Gr -I
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand R. D. Block Closed 17 Sep 2024
View tender -
Construction of Vegetable Market Sheed at Bara Bazar Dutta Para in Ward No X under Alipurduar Municipality
MUNICIPAL AFFAIRS DEPARTMENT | State Govt. and UT · Ward No 10 Closed 30 May 2025
View tender -
FDR/ urgent Mtc of different road for Manu Bazar and Murashing Para area surface under Santirbazar Sub-Division
SH- Removal of Soil, Construction of Embankment, Missing Soling, Repairs of Potholes, Unlined surface drain, Palasiding Works etc. during the year 2024-25.
Chief Engineer, PWD (R and B) | State Govt. and UT · Santirbazar, South Tripura Closed 3 Sep 2024
View tender -
Mtc. of road from i) Satchand Bazar to Natun Bazar via Dhanu Chowdhury para (2.50 km). ii) Manu-Srinagar road to Bhuddimangal Para (L-3.600 km) during the year 2025-26
SH - Patch Metalling, Patch carpeting, seal coat and CD (1.00mX1.00m) etc. (2nd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 2 Dec 2025
View tender -
Construction of Lift Irrigataion Scheme at Alashya Bazar near Jamatia Para over Manu cherra under Manu VC of Bagafa RD Block, South Tripura District during the year 2024-25
Construction of Pump House, Pump motor installation, Priming tank and laying of UPVC distribution system.
Chief Engineer PWD (WR) | State Govt. and UT · O/o The EE, WRD-IV, BLN Closed 2 Apr 2025
View tender