Tender Details
Particulars | Details |
---|---|
Title |
Development Of Ayurveda College Udumbanchola Compound Wall Phase 1
|
Description |
Development Of Ayurveda College Udumbanchola Compound Wall Phase 1
|
Organisation | WAPCOS Limited | Central Govt. Ministry/Department |
Tender Id | 2024_WAPCO_711857_1 |
Reference Number |
WAP/INFRA/KERALA/2024/UNCW/496 |
Tender Fee | 2950 |
EMD | 50000 |
Tender Value | |
Place | Udumbanchola, Idukki |
Link | https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1084756 |
Start Date | December 07, 2024 14:30 |
End Date |
17/12/2024 ( Expired 154 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read morePhase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreRequest for proposal (rfp) for the development of public charging stations through public private partnership in identified cities of uttar pradesh
Request for proposal (rfp) for the development of public charging stations through public private partnership in identified cities of uttar pradesh.
Read moreDevelopment, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Development, operation and maintenance of the multi modal logistics park (mmlp) hyderabad at parkibanda village in manoharabad mandal of medak district, in the state of telangana through public private partnership on dbfot basis
Read moreDevelopment, operation and maintenance of wayside amenities on lease basis,(5 o-m sites)(nh-43/kunkuri to chhattisgarh-jh/597-650/rhs/)
Development, operation and maintenance of wayside amenities on lease basis (5 o-m sites),(nh-43/kunkuri to chhattisgarh-jharkhand/597-650/rhs/sai tangartoli/cg)
Read moreImport substitution of items by indigenous development
Import substitution of items by indigenous development
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreDevelopment of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for integrated manufacturing and logistic cluster imlc unnao uttar pradesh india with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreof your Industry type