Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Carting And Fixing Of Rail Boundary Post By Release Psc Sleeper Between Khalilabad To Dumariaganj And Construction Of Temporary Camp Office Store And Other Related Work Between Khalilabad To Bansi Section Of Khalilabad Bahraich New Rail Line Project.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72955096 |
|
Reference Number |
DYCE-CON-G-GKP-02-2024 |
| Tender Fee | 0 |
| EMD | 2.88 Lakh |
| Tender Value | - |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72955096/viewNitPdf_4446309.pdf |
| Start Date | January 06, 2024 19:02 |
| End Date |
Expired
01/02/2024
Expired 988 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Psc sleeper for 60 kg rail, as per rdso drawing t-8746 with latest amendment, if any,psc curve sleeper for 60 kg rail, as per rdso drawing t-8982 with latest amendment, if any
Psc sleeper for 60 kg rail, as per rdso drawing t-8746 with latest amendment, if any,psc curve sleeper for 60 kg rail, as per rdso drawing t-8982 with latest amendment, if any
Read moreBalance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of earthwork in formation, blanketing and construction of minor bridge no. 15,25,35 and 37 between the section of bhagauli(excluding) to bakhira (including) in connection with khalilabad- bahraich new b.g rail line project.
Read moreBalance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Balance work of execution of earthwork in formation, blanketing and construction of minor bridge no. 40, 44, 46, 53 & 60 between the section of mehdawal (excluding) to kheshraha (excluding) in connection with khalilabad- bahraich new b.g rail line project.
Read moreElastic rail clip(erc) j clip with higher toe load for fish plated joint /insulated glued joint on psc sleeper drg: (rdso) rdso_t_8258_ alt_1 spec: (rdso) irs/t-31-2025 sixth revision
Elastic rail clip(erc) j clip with higher toe load for fish plated joint /insulated glued joint on psc sleeper drg: (rdso) rdso_t_8258_ alt_1 spec: (rdso) irs/t-31-2025 sixth revision
Read moreRate contract for manufacture and supply of turnout psc sleeper for 1 in 8.5 with 6400 mm over riding switch (curved) & cms crossing b.g. (1673 mm) for b.s. 90r, 52kg & 60 e1 rail.
Rate contract for manufacture and supply of turnout psc sleeper for 1 in 8.5 with 6400 mm over riding switch (curved) & cms crossing b.g. (1673 mm) for b.s. 90r, 52kg & 60 e1 rail.
Read moreTurnout psc sleeper 1 in 12 turnout with 10125 mm overriding switch (curved) & cms crossing b.g. (1673 mm) for 60e1 rail .(drawing and item details as mentioned in set documents are applicable) drg: (rdso) rdso/t-4218, alt.11 spec: (rdso) irs t 45 4th rev march 2021 with corrigendum 1 2 set doc: set document for rt-4218.
Turnout psc sleeper 1 in 12 turnout with 10125 mm overriding switch (curved) & cms crossing b.g. (1673 mm) for 60e1 rail .(drawing and item details as mentioned in set documents are applicable) drg: (rdso) rdso/t-4218, alt.11 spec: (rdso) irs t 45 4th rev march 2021 with corrigendum 1 2 set doc: set document for rt-4218.
Read moreA.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
Read moreLinking of track, loading/unloading, carting of various p- way materials, and other miscellaneous works between khalilabad (incl.)-bansi (incl.) in connection with khalilabad-bahraich new line project of lucknow division of n. e. railway
For complete deion and other details, please refer to tender
Read moreof your Industry type