Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Psc Sleepers Broad Gauge, Bridge Guard Rail Sleeper, Bridge Approach Sleepers And Psc Turn Out Sleepers
|
Description |
Procurement Of Psc Sleepers Broad Gauge (Pre Tension), Bridge Guard Rail Sleepers, Bridge Approach Sleepers And Psc Turn Out Sleepers Suitable For 25 Tonne Axle For Voestalpine Vaevkn Design Of Turnout For Dfccil Ctp 12 Project
|
Organisation | IRCON International Limited | Public Sector Undertakings |
Tender Id | 2024_IRCON_210967_1 |
Reference Number |
IRCON/3018/DFCCTP12/ eTender/Sleeper spares/8-495 |
Tender Fee | 20000 |
EMD | 9.15 Lakh |
Tender Value | |
Place | Ancheli to Saphale |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=231240 |
Start Date | October 17, 2024 20:30 |
End Date |
18/11/2024 ( Expired 177 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreReplacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Replacement of 600 mm dia psc pipe to 600 mm di pipe - paichaiyar river to railway bridge west side sluice value and railway bridge east side sluice value to munnerpalam police station at suthamali head work to magalizchi nagar pumping main.
Read moreDesign and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Design and constrctn of 300 mtr major psc balanced cantilever bridge at km 105.00 tawi br along with its approaches, collection of hydraulic data, ssi, proof checking, formulation of tentative br scheme on du rd p sampark in jk on epc mode
Read morePainting of dcr building external walls, rcc railing over deck bridge, intake structure, level gauge painting and misc. areas around dcr of indira sagar power station, narmada nagar, distt. khandwa (m.p.).
Painting of dcr building external walls, rcc railing over deck bridge, intake structure, level gauge painting and misc. areas around dcr of indira sagar power station, narmada nagar, distt. khandwa (m.p.).
Read moreConstruction of approach road, additional approach road and protection work yamuna river bridge malav aligarh
Construction of approach road, additional approach road and protection work of 2-lane bridge at over yamuna river hasanpur district palwal (haryana) to malav -district aligarh (between uttar pradesh) marg in district aligarh (u.p.)
Read moreConstruction of shahjad river bridge lalitpur
Construction of shahjad river bridge on azad chowk - kailguwan marg, approach road and protection work in distt lalitpur.
Read more2nd call increasing height of intakewell and approach bridge under water supply scheme nagar parishad nowrozabad
2nd call increasing height of intakewell and approach bridge under water supply scheme nagar parishad nowrozabad
Read moreConstruction of boundary wall with gate, guard room, land development, approach road and masonry drain for the proposed over head reservoir site at zone-ii, tilandrapur within panskura municipality under amrut 2.0
Construction of boundary wall with gate, guard room, land development, approach road and masonry drain for the proposed over head reservoir site at zone-ii, tilandrapur within panskura municipality under amrut 2.0
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreConstruction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Construction of new banelli river bridge on km. 10 of the jaspur-dhampur road in bijnor, parallel to old existing bridge, approach roads and protection works in district bijnor.
Read moreof your Industry type