Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Special Repair Work At Budera To Syodhi Road With Pc, Seal Coat In Km. 4(300) And Cc Pavement Work In Km. 4(150)
|
Description |
Special Repair Work At Budera To Syodhi Road With Pc, Seal Coat In Km. 4(300) And Cc Pavement Work In Km. 4(150)
|
Organisation | Chief Engineer Jhansi Zone PWD Jhansi UP | State Govt. and UT |
Tender Id | 2025_CEJNS_1005565_1 |
Reference Number |
159/A3 Dt-07-02-2025 |
Tender Fee | 854 |
EMD | 1.37 Lakh |
Tender Value | |
Place | Mahoba |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1799839 |
Start Date | February 13, 2025 17:30 |
End Date |
20/02/2025 ( Expired 139 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreCutting, uprooting and removal of trees for the work of widening to 2l ps in km 15/600-38/800 (except km 28/2-28/6 and km 33/100-33/200) and improvements in km 17/300- 21/300, km 22/200-26/0, km 26/600 - 28/0, km 28/60-30/8, km 31/700 - 33/100, km 33
Cutting, uprooting and removal of trees for the work of widening to 2l ps in km 15/600-38/800 (except km 28/2-28/6 and km 33/100-33/200) and improvements in km 17/300- 21/300, km 22/200-26/0, km 26/600 - 28/0, km 28/60-30/8, km 31/700 - 33/100, km 33
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Consultancy services for authority engineer for supervision of construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu through an engineering, procu
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation of existing intermediate lane flexible pavement to 2l with ps from km 0.00 to km 75.00 on orchha tikamgarh shahgarh nh 539 in the state of madhya pradesh on epc mode.
Read moreStmc hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29
Short term maintenance contract for hill cutting across the river at ch 126.100 to ch 126.200 in dimapur kohima road section on nh-29 in the state of nagaland in fy 2025-26 percentage rate and work order basis
Read moreof your Industry type