Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement Of Kawadapur Junction Road Vr 64 In Km 1/0 To 2/0 With Construction Of Cd Work Taluka Samudrapur Dist Wardha
|
| Description |
Improvement Of Kawadapur Junction Road Vr 64 In Km 1/0 To 2/0 With Construction Of Cd Work Taluka Samudrapur Dist Wardha
|
| Organisation | Public Works Region | State Govt. and UT |
| Tender Id | 2024_PWR_1010159_1 |
|
Reference Number |
2324TN7405 |
| Tender Fee | 1180 |
| EMD | 66000 |
| Tender Value | |
| Place | SAMUDRAPUR |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1766627 |
| Start Date | February 19, 2024 14:30 |
| End Date |
Expired
26/02/2024
Expired 867 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreIe services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Ie services during onm period of tolling operation maintenance n transfer of 1.raipur to sa sec of nh30 old nh200 from km0.000 to km48.580 2.sa to bilaspur sec of nh130 old nh200 n nh49 from km.48.580 to km.126.525 in chhattisgarh
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Construction of dini to nadgal motor road at block dhari in bhimtal assembly constituency of nainital district under the chief ministers rural road scheme (phase ii, stage 1)
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreImprovement of girgaon to musa road vr-131 in km 0/0 to 1/00 taluka samudrapur dist wardha
Improvement of girgaon to musa road vr-131 in km 0/0 to 1/00 taluka samudrapur dist wardha
Read moreImprovement of faridpur to mohgaon to dist boundry road vr-114 in km 0/0 to 2/0 taluka samudrapur dist wardha.
Improvement of faridpur to mohgaon to dist boundry road vr-114 in km 0/0 to 2/0 taluka samudrapur dist wardha.
Read moreof your Industry type