Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Repairing Of 04sets Of Clutch Assembly (Male Part No 15 N716 And Female Part No 15 N718) Of Pand H 1900 Al Shovel At Kakri Project.
|
Description |
Repairing Of 04sets Of Clutch Assembly (Male Part No 15 N716 And Female Part No 15 N718) Of Pand H 1900 Al Shovel At Kakri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_336704_1 |
Reference Number |
KKR/SO(Excv)/E-13/25-26/108 |
Tender Fee | 0 |
EMD | 1100 |
Tender Value | |
Place | NCL Kakri Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=349040 |
Start Date | June 01, 2025 15:00 |
End Date |
11/06/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Aoh kit ep contactor filter on/off. each consist of 7 items 8 nos. (1) cartridge body assly, aal part no. 2220007100/04 - 01 nos (2) rubber o ring valve housing, aal part no. 2220007100/06 - 02 nos (3) rubber o ring piston sm, aal part no. 2220007100/07 - 01 no (4) rubber o ring cylinder sm, aal part no. 2220007100/05 - 01 no. (5) rubber o ring air conn, aal part no. 2220007100/08 - 01 no. (6) seal piston sm, aal partno. 2220007100/09 - 01 no. (7) rubber cap, aal part no. 2220007100/10 - 0
For complete deion and other details, please refer to tender
Read moreIntegrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode.
Integrated development of outer container terminal and berth no. 1 though 5 nsd at kds, smpk on dbfot basis through ppp mode
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreCs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Cs of 2l vup at mukundpur junc 4l vup at lahra mod junc 4l vup at eglas chauraha junc 4l vup at kota kapura junc 4lane vup at poiya junc and 4l of malupur tiraha as part of rectification of morth identified bs in up on epc mode
Read moreE tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
E tender cum e auction for allotment of land parcel and assets 1.5 ha. (plot no. f-5) on fresh long term lease basis of 30 yrs under pglm 2015 (and clarifications issued by mopsw from time to time till 10.12.2024) for liquid storage facilities at jnp
Read moreConstruction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Construction of 220/132 kv, 160 mva and 132/33 kv, 1x31.5 mva gss at bambloo (district-bikaner) along with 01 no. of 33 kv, 5.43 mvar capacitor bank at 220 kv gss, bambloo and 2x220 kv bays at 220 kv gss seruna work on turnkey basis bn9019002518
Read moreConstruction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Construction of 16 nos living accommodation other than married for jcos/supvrs at hq ce p swastik under job no. 30/279 and construction of 29 nos living accommodation other than married for or at hq ce p swastik under job no. 30/280 on gangtok
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreConstruction of c.c. road and nali work at motiram yadav house to uttam neta ji house graam ganga mahalpur ward 63 file no. 124/22x3/6
Construction of c.c. road and nali work at motiram yadav house to uttam neta ji house graam ganga mahalpur ward 63 file no. 124/22x3/6
Read moreConstruction of c.c. road and culvert with hume pipe at village baraua ramadhar ke khet se sobran singh tak zone 25. ward no.66 file no.210/25x3/6.
Construction of c.c. road and culvert with hume pipe at village baraua ramadhar ke khet se sobran singh tak zone 25. ward no.66 file no.210/25x3/6.
Read moreof your Industry type