Tender Details
Particulars | Details |
---|---|
Title |
Dismantling Of Existing M.S. Pipes Of Sizes (8/10/12) Inch Dia From Various Location Of Mines And Transportation To En M Workshop With Proper Facing At Both Ends For Reuse At Kocp.
|
Description |
Dismantling Of Existing M.S. Pipes Of Sizes (8/10/12) Inch Dia From Various Location Of Mines And Transportation To En M Workshop With Proper Facing At Both Ends For Reuse At Kocp.
|
Organisation | South Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_SECL_300247_1 |
Reference Number |
SECL/GM/KSM/EnM/ eTender/23-24/59 |
Tender Fee | 0 |
EMD | 60800 |
Tender Value | |
Place | KUSMUNDA OPEN CAST PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=311013 |
Start Date | February 05, 2024 16:30 |
End Date |
17/02/2024 ( Expired 479 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Dismantling, extension cum laying of the 8 inch dia m.s. pipes of the 2000 g.p.m. pump motor set, supplying water to the village pond in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreTransportation, welding, laying, aligning and jointing of 8 inch (200mm) dia m.s pipe line from deulbera pit top to wtp of iwss, lingaraj area
Transportation, welding, laying, aligning and jointing of 8 inch (200mm) dia m.s pipe line from deulbera pit top to wtp of iwss, lingaraj area
Read moreLaying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Read moreRelocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Relocation of ms,hdpe pipe line of size 8 inch ,10 inch dia from mines sump to north discharge point near kalvat at quarry lajkura ocp, ib valley area
Read moreMaintenance /repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project
Maintenance/ repairing /dismantling / laying of 6 inch, 8 inch and 10 inch dia 3 ranges pipe line installed at mine for dewatering purpose for monsoon preparation at tapin north open cast project under hazaribagh area
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreLaying, transportation and dismantling of ms pipe delivery lines size (4/6) inch dia at various coal stocks in the mines for fire-fighting purpose at kocp.
Laying, transportation and dismantling of ms pipe delivery lines size (4/6) inch dia at various coal stocks in the mines for fire-fighting purpose at kocp.
Read moreMaintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Maintenance of existing 10 inch, 8 inch and 6 inch dia pipeline from coal face sump,main sump to water discharge point near pit office for dewatering purpose to meet production target in financial year 2025-26 at peocp under hazaribag area.
Read moreComplete repairing and testing of different sizes of sluice valve and non- valve (12 inch,10 inch and 8 inch) at amlohri project
Complete repairing and testing of different sizes of sluice valve and non- valve (12 inch,10 inch and 8 inch) at amlohri project
Read moreof your Industry type