Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Conversion Of Lt Oh Line Into Ug Cable At Temple Lane (In Between Shiv Temple And Longewala Gate) At Ramgarh Cantt
|
Description |
Conversion Of Lt Oh Line Into Ug Cable At Temple Lane (In Between Shiv Temple And Longewala Gate) At Ramgarh Cantt
|
Organisation | E-IN-C BRANCH - MILITARY ENGINEER SERVICES | Central Govt. Ministry/Department |
Tender Id | 2024_MES_677519_1 |
Reference Number |
8300/3276-A/E8 |
Tender Fee | 500 |
EMD | 99920 |
Tender Value | |
Place | RAMGARH CANTT |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=757766 |
Start Date | October 15, 2024 23:30 |
End Date |
22/10/2024 ( Expired 256 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreWidening a upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including ut
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of blackspot id no. pb 03 186 at location km. 154.310 rureke kalan on nh703 in the state of punjab job no rureke kalan on nh 703 punjab 2024 25 rse 33 including
Read moreConsultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Consultancy services for ae for supervision of construction of missing link from birhu to lathiani into 4 lane from km 35.550 to km 42.800 on nh-503a including cable stayed bridge (0.860 km) in himachal pradesh on epc mode.
Read moreConstruction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read more1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreMaintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Maintenance of line through under ground cabling in kunjaban extension area where key installations including state disaster response control room is situated and creation of infrastructure and installation of 17 nos dt at different areas under ed ca
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreof your Industry type