Tender Details
Particulars | Details |
---|---|
Title |
Through Ballast Renewal Including Deep Screening And Raising Of Ballast Cushion To Standard For A Length Of 30.071 Tkm From Km. 219.20 To Km. 401.254 (In Patches) Between Malligura And Kirandul Stations On Kk Ii Line Of Waltair Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78974261 |
Reference Number |
eT-West-WAT-41-2024 |
Tender Fee | 0 |
EMD | 2.11 Lakh |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78974261/viewNitPdf_4803732.pdf |
Start Date | December 13, 2024 14:54 |
End Date |
06/01/2025 ( Expired 128 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreFdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Fdr / mtc. of conneting road from amrit para bailey bridge to bop camp under jatanbari pwd (randb) sub-division, (ch. from 0.00 km to 0.480 km, length-0.480 km) /sh- wbm-iii, through-out 25mm carpeting , sand seal coating and other allied works dur
Read moreConstr/impvt of road birdhwal-puggal-bajju between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc
Constr/impvt of road b-p-b between km 136.537 and km 212.450 (net design length 75.913 kms) from iw to nhdl specifications (paved shoulder) including shifting of utilities under 49 brtf/project chetak in the state of rajasthan on epc mode
Read moreSupply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 177 to 180 and 191 to 196 under electricity transmission division-ii, basti h.q. at siddharth nagar
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 177 to 180 and 191 to 196 under electricity transmission division-ii, basti h.q. at siddharth nagar
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Read moreRestoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Restoration shifting of pipe line including testing and commissioning in between 57 km to 77 km pakage-iii on beripattan jhalas road deposit work
Read moreEngagement of user fee agency through e-tender for garhdevi fee plaza at km 203.000 four laning between km 196.870 (sankha) to km 219.600 (khajuri) on nh39 in the state of jharkhand and bihar
Engagement of user fee agency through e-tender for garhdevi fee plaza at km 203.000 four laning between km 196.870 (sankha) to km 219.600 (khajuri) on nh39 in the state of jharkhand and bihar
Read moreRe-sagging/re-tensioning work to be done at between various locations of 132kv seoni-pench line, 132 kv gopalganj (tbcb)-pench and 132kv seoni-katangi/lalbarra feeder total 4.463 km through labour contract under ee (eht-maint.) dn., seoni
Re-sagging/re-tensioning work to be done at between various locations of 132kv seoni-pench line, 132 kv gopalganj (tbcb)-pench and 132kv seoni-katangi/lalbarra feeder total 4.463 km through labour contract under ee (eht-maint.) dn., seoni
Read moreof your Industry type