Tender Details

Particulars Details
Title
Through Ballast Renewal Including Deep Screening And Raising Of Ballast Cushion To Standard For A Length Of 30.071 Tkm From Km. 219.20 To Km. 401.254 (In Patches) Between Malligura And Kirandul Stations On Kk Ii Line Of Waltair Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78472312
Reference
Number
eT-West-WAT-36-2024
Tender Fee 0
EMD 2.11 Lakh
Tender Value
Place Bhubaneswar
Link https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78472312/viewNitPdf_4774006.pdf
Start Date November 15, 2024 18:34
End Date

09/12/2024 ( Expired 208 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Balance periodic renewal work in km. 14.200 to 25.530 and 31.540 to 55.700 total length 35.480 km. on n.h. 30 (old n.h. 221) jagdalpur-sukma road on epc mode in the state of chhattisgarh on epc mode.

Read more
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)

Read more
Raising strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Raising, strengthening and construction of flexible pavement road on esml total length 31.985 km with restoration of 7 nos. stud and construction of 13 nos. new studs from km 14.00 to km 26.275 of esml under bwsimp.

Read more
Permanent di of ruaral water supply pipe lines located between gundlakamma kanigiri stations i.e., from ch 74700 m to ch:155000 m on nadikudi - srikalahasthi new bg line project in podili rws(p) division jurisdiction of prakasam district est cost rs.9679715.00

Permanent di of rural water supply pipe lines located between gundlakamma kanigiri stations i.e., from ch: 74700 m to ch: 155000 m on nadikudi - srikalahasthi new bg line project in podili rws (p) division jurisdiction of prakasam district, est.cost: rs.9679715.00

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Providing and laying of renewal coat on road from lr marta to sunetar khas, package no jk14-482 block ramnagar, district udhampur, length 6.00 km

Providing and laying of renewal coat on road from lr marta to sunetar khas, package no jk14-482 block ramnagar, district udhampur, &#x0d length 6.00 km&#x0d

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
The work of height raising and shirting of 220 kv d c moradabad c b ganj line on behalf of u p state bridge co ltd corridor under electricity transmission division ii moradabad

The work of height raising and shirting of 220 kv d c moradabad c b ganj line on behalf of u p state bridge co ltd corridor under electricity transmission division ii moradabad

Read more
Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland

Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland

Read more
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise