Particulars | Details |
---|---|
Title |
Through Ballast Renewal Including Deep Screening And Raising Of Ballast Cushion To Standard For A Length Of 30.071 Tkm From Km. 219.20 To Km. 401.254 (In Patches) Between Malligura And Kirandul Stations On Kk Ii Line Of Waltair Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78472312 |
Reference Number |
eT-West-WAT-36-2024 |
Tender Fee | 0 |
EMD | 2.11 Lakh |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78472312/viewNitPdf_4774006.pdf |
Start Date | November 15, 2024 18:34 |
End Date |
09/12/2024 ( Expired 184 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode
Read moreRevised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Revised cost estimate for construction of 2 lane major bridge over brahmaputra between majuli on north bank and jorhat on south bank from km.11.690 to km. 19.715 (length of bridge 6812.5m)on nh-715k in the state of assam.(job no715/as/2020-21/213)
Read morePerformance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Performance based maintenance contract (pbmc) work on nh 02 (old nh 61) from km 125.000 to km 135.000 (length 10.00 km) under nh division ii mokokchung in the state of nagaland
Read moreFdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Fdr/mtc. of road from i) a-u road to mokraibari road(l-1.00) and ii)debbari bazar to chabimura via kamaria khola(l-3.932) (total length-4.932 km), under the jurisdiction of sub-division no.-i during the year 2025-26./sh-grouting, patch wbm-ii and wb
Read moreSupply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Supply of material and di of 220 kv bansi-pgcil double circuit transmission line between location no. 200 to 207 under electricity transmission division-ii, basti h.q. at siddharth nagar
Read moreConstruction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh
Read moreMtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Mtps i chp i deep screening through packing lifting the track line ballast deficiency makeup work with 40mm hard broken stone ballast grinding the elongated edges of rails and reversing the grounded rails into its position in wagon tippler iii inhau
Read moreConstr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Constr imprvt of along - yingkiong road between km 40.00 to km 65.00 design chainage km 40.000 to 63.740 design length 23.740 km for constr and upgradation from cl09 to nhdl specn under 761 brtf project brahmank in ap on epc mode
Read moreConstruction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Construction of rob (between com and gnd stations) at railway from km. 162/2 to 163/3 on jp-rgs section bypass road work near chomu mahla road from km. 0/000 to km. 4/100 etc. on epc mode
Read moreErection of 11 kv line 16.5 km and 11 kv sub station for releasing of 150 nos agriculture connection under sub division dechu under phalodi circle including transportation of material from sub division store to site on labour rate basis 2022
Erection of 11 kv line 16.5 km and 11 kv sub station for releasing of 150 nos agriculture connection under sub division dechu under phalodi circle including transportation of material from sub division store to site on labour rate basis 2022