Tender Details
Particulars | Details |
---|---|
Title |
Telecom Work In Connection With The Works (1) Anand Cambay Section Interlocking Of Lc Gate No. 7. (2) Anand Cambay Section Interlocking Of Lc Gate No. 9. (3) Anand Cambay Section Interlocking Of Lc Gate No. 31. (4) Anand Cambay Section Interlocking Of Lc Gate No. 36.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72741757 |
Reference Number |
SandT_BRC_23-24_33_TELE |
Tender Fee | 0 |
EMD | 20700 |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72741757/viewNitPdf_4435284.pdf |
Start Date | January 04, 2024 22:47 |
End Date |
12/02/2024 ( Expired 484 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreRain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Rain water harvesting work in different areas of ward 24 with labour and material at site morar file no. 191/25x9/1
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreItem 1,item 2,item 3,item 4,item 5,item 6,item 7,item 8,item 9,item 10,item 11,item 12,item 13
Read more
Schedul 1,schedul 2,schedul 3,schedul 4,schedul 5,schedul 6,schedul 7,schedul 8,schedul 9,schedul 1
Read more
Title 1,title 2,title 3,title 4,title 5,title 6,title 7,title 8,title 9,title 10,title 11,title 12,
Read more
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreof your Industry type