Tender Details

Particulars Details
Title
Signalling And Telecom Works In Connection With Lus Work At 05 Lc Gates (Lc No. 36, 47, 49, 52 And 54) In Ajj Jtj Section Of The Chennai Division.
Description
For Complete Deion And Other Details, Please Refer To Tender
Organisation Ministry of Railways | Central Govt. Ministry/Department
Tender Id 78715492
Reference
Number
M-SG-2024-25-429
Tender Fee 0
EMD 2.11 Lakh
Tender Value
Place Chennai
Link https://www.ireps.gov.in/ireps/works/pdfdocs/012025/78715492/viewNitPdf_4788959.pdf
Start Date December 16, 2024 16:36
End Date

07/01/2025 ( Expired 104 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Special repairing works ( additional work ) in connection with establishment of regional semen production laboratory and semen bank for goat at haringhata, nadia-741246 under paschim banga go-sampad bikash sanstha

Special repairing works ( additional work ) in connection with establishment of regional semen production laboratory and semen bank for goat at haringhata, nadia-741246 under paschim banga go-sampad bikash sanstha

Read more
Construction and commissioning of 01 no 200mm dia tubewell with

Construction and commissioning of 01 no 200mm dia tubewell with &amp#x0d 02 years defect liability period at uwss behror and depeening of 02 &amp#x0d no tubewells at subdivision neemrana under emergent work for &amp#x0d summer 2025 in the jurisdiction of division behror

Read more
Carrying out fire proofing work of steel structures in connection with civil and structural works at ongc uran plant of m/s. oil and natural gas corporation limited (ongc)

Carrying out fire proofing work of steel structures in connection with civil and structural works at ongc uran plant of m/s. oil and natural gas corporation limited (ongc)

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more

Upgradation work in various type of flats at sector-13, r.k. puram, new delhi under 2/s sub division (sh: strengthening and water proofing works).

Read more
Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc

Providing, installation and commissioning of submersible pumping machinery along with allied electro-mechanical works for augumentation in connection to accommodate fhtc at p.h. no.-i, ii, iii iv (new) under dakshin akhratala w/s scheme under bloc

Read more
Irrigation precautionary measure for goaltore branch canal(glt.b.c.) from ch.52.00 to ch.483.00 in connection with kharif irrigation 2025 (1st, 2nd and 3rd watering) under goaltore section of k.c sub-division no.-i, salboni, paschim medinipur.

Irrigation precautionary measure for goaltore branch canal(glt.b.c.) from ch.52.00 to ch.483.00 in connection with kharif irrigation 2025 (1st, 2nd and 3rd watering) under goaltore section of k.c sub-division no.-i, salboni, paschim medinipur.

Read more
Shifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates

Shifting of electrical infrastructure with laying of 11 kv ug line to facilitate the work of construction of limited height subway at several lc gates in between khetia and balgona station at burdwan katwa rail line under purba bardhaman district

Read more
05/ee/ndn/2025-26

Upgradation/maintenance in gpra quarters at pandara road, pandara park and bharti nagar and other locations under sc 206, 209 211 n division cpwd, new delhi dg 2025-26 sh- repair and renovation work of kitchen toilets, bathroom, rooms, cupboards doors upvc s i/c other misc. works in d1/193, bharti nagar, other area under jurisdiction of 4n sub division.

Read more
Repair of cracks in rigid pavement and bc work in flexible pavement including immediate rectification of misc works on kharagpur to chichra section of nh-49 from km 129.600 to km 185.150 at the risk and cost of the epc contractor in the state of wb

Repair of cracks in rigid pavement and bc work in flexible pavement including immediate rectification of misc works on kharagpur to chichra section of nh-49 from km 129.600 to km 185.150 at the risk and cost of the epc contractor in the state of wb

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise