Tender Details

Particulars Details
Title
Execution Of Day To Day Maintenance Work For 324 Family Quarter Type Ii At Gc Silchar Assam
Description
Execution Of Day To Day Maintenance Work For 324 Family Quarter Type Ii At Gc Silchar Assam
Organisation Central Public Procurement Portal 1
Tender Id 2023_CRPF_769752_1
Reference
Number
26-NEZ-C/Cell-GCSLR/2023-24
Tender Fee 0
EMD 9320
Tender Value
Place CONTRACT CELL NE ZONE HQR CRPF 9th MILE GUWAHATI
Link https://eprocure.gov.in
Start Date September 02, 2023 14:30
End Date

16/09/2023 ( Expired 612 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic

Rfp for concessionaire for operation and maintenance of electromagnetic interference (emi) / electromagnetic&amp#x0d compatibility (emc) testing facility in&amp#x0d sipcot medical devices park at oragadam, kancheepuram dist. for a period of 10 years&amp#x0d

Read more
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority

Read more
Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Cs for preparation of detailed project report of capacity augmentation (from 2 to 4 lane) of (i) manoharpur dausa section and lalsot kothun section of nh 148/23 and (ii) salasar nagaur section of nh 58 in the state of rajasthan

Read more
Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre

Maintenance dredging of mahanadi river channel of paradip port authority for the year 2025-26 to dredge a total in-situ quantity of 1.5 lakhs cu.mtr. up to its desired depth of 3.5 metre

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise