Tender Details
Particulars | Details |
---|---|
Title |
Boiler Efficiency Test Unit#1 At 2 X660 Mw Of Jaypee Nigiri Power
|
Description |
Boiler Efficiency Test Of Unit#1 At 2 X660 Mw Of Jaypee Nigiri Power
Limited, Nigrie Singrauli
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id | 2024_NTPC_87903_1 |
Reference Number |
NTPC/Consultancy/9900282772 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Consultancy Wing EOC Annexe BUILDING, A-8A SECT NO |
Link | https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=91094 |
Start Date | June 19, 2024 00:25 |
End Date |
25/06/2024 ( Expired 334 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreLeasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreRequest for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Request for proposal (rfp) for selection of agency for installation of de-sliming system at hus (mk unit) on engineering procurement construction (epc) basis
Read moreDesign, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Design, engineering, supply, installation, commissioning, own, operation and maintenance for a period of 40 years of 4x250 kw surface hydrokinetic power plant at tail race channel of kotla hydro power station, bbmb under resco mode
Read moreRequest for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Request for proposal for design, engineering, supply, construction, erection, testing, commissioning of 10 mw ac and operate and maintain for 25 years solar pv power project on annuity payment basis linked to monthly unit generation
Read moreConstruction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreProcurement of 06 numbers of grinding ring and 216 numbers of ball of el-76 pulveriser at unit-2, btps.
Procurement of 06 numbers of grinding ring and 216 numbers of ball of el-76 pulveriser at unit-2, btps.
Read moreConstruction of primary wing school at kv 1 dehu road.
Construction of primary wing school at kv 1 dehu road.
Read moreErection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13
Erection commissioning and changing the instruments of turbine panel at tg floor 9 mtrs including fabrication fixing of instruments tags during overhauling of unit no 13 btps obra
Read moreof your Industry type