Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Improvement To Black Spot At Kalbetta Junction Ka 02 422 On Bantwal Bengaluru Section Of Nh 275 In The State Of Karnataka On Item Rate Basis
|
| Description |
Improvement To Black Spot At Kalbetta Junction Ka 02 422 On Bantwal Bengaluru Section Of Nh 275 In The State Of Karnataka On Item Rate Basis
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2025_MoRTH_843460_1 |
|
Reference Number |
RW/BNG/ Blackspot/NH-275/Kalbetta Junction/49/2024 |
| Tender Fee | 11800 |
| EMD | 3.57 Lakh |
| Tender Value | - |
| Place | Bantwal Bengaluru section |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=886594 |
| Start Date | January 08, 2025 21:30 |
| End Date |
Expired
21/02/2025
Expired 555 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Disposal of mixed ms scrap by one time contract at ksdl, bengaluru complex on as is where is basis
Disposal of mixed ms scrap by one time contract at ksdl, bengaluru complex on as is where is basis
Read moreTender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis
Tender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis
Read moreConstruction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration
Read moreProviding new 11kv c&r panel & integration of c&r at 66/11kv national college substations pertaining to operation division hsr layout in the jurisdiction of transmission(operation) south circle, bengaluru on total turnkey percentage tender basis
Providing new 11kv c&r panel & integration of c&r at 66/11kv national college substations pertaining to operation division hsr layout in the jurisdiction of transmission(operation) south circle, bengaluru on total turnkey percentage tender basis
Read moreAnnual maintanance of road year of 2026-27 highway connecting kengal (on nh-275) to alur (on sh-110l) via yadiyur,(on nh-75), road from ch 134.57 to 136.67 km and 137.07 to 137.27km and 138.27 to 140.47 km ( 133.36 to 147.59 km and 154.82 to 160.93km)
Annual maintanance of road year of 2026-27 highway connecting kengal (on nh-275) to alur (on sh-110l) via kanva, dasawara, makali, ujjani, hithalapura, huliyurdurga, k honnamachanahalli, keelara, hanchipura, paduvagere, hanumapura gate (on sh-84) kodavatti, yadiyur,(on nh-75), bilagunda, mayasandra,/soravanahalli (on nh150a) bochihalli, talkere, aralikerepalya, vishwanathapura, (on nh-150a), turuvekere, nonavinakere, hedgarahalli, (on sh-47) hunaseghatta, sasalahalli, dasarighatta cross, kenkere (on sh-71) edigarahatti, gandasi (on sh7) mahadevrahalli, bageshpura, (on sh-102) neeragunda, nittur, rayapura, (on sh-21) kadadaravalli (on nh-373), chikkagadduvalli, kalatammanahalli, doddakanagal (sh-275) road from ch 134.57 to 136.67 km and 137.07 to 137.27km and 138.27 to 140.47 km ( 133.36 to 147.59 km and 154.82 to 160.93km)
Read moreConstruction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration
Read morePeriodical renewal from km 279.990 to km 286.405 in maddur town limit on nh 275 bantwal bangalore section
Periodical renewal from km 279.990 to km 286.405 in maddur town limit on nh 275 bantwal bangalore section
Read morePeriodical renewal from km 324.090 to km 329.885 in bidadi town limit on nh 275 bantwal bangalore section
Periodical renewal from km 324.090 to km 329.885 in bidadi town limit on nh 275 bantwal bangalore section
Read morePeriodical renewal junction improvement and footpath improvement etc for mandya town from km 256 500 to km 264 900 on nh 275 bantwal bangalore section bypassed stretches
Periodical renewal junction improvement and footpath improvement etc for mandya town from km 256 500 to km 264 900 on nh 275 bantwal bangalore section bypassed stretches
Read morePeriodical renewal from km 279 990 to km 286 405 in maddur town limit on nh 275 bantwal bangalore section
Periodical renewal from km 279 990 to km 286 405 in maddur town limit on nh 275 bantwal bangalore section
Read moreof your Industry type