Tender Details

Particulars Details
Title
Improvement To Black Spot At Kalbetta Junction Ka 02 422 On Bantwal Bengaluru Section Of Nh 275 In The State Of Karnataka On Item Rate Basis
Description
Improvement To Black Spot At Kalbetta Junction Ka 02 422 On Bantwal Bengaluru Section Of Nh 275 In The State Of Karnataka On Item Rate Basis
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_843460_1
Reference
Number
RW/BNG/ Blackspot/NH-275/Kalbetta Junction/49/2024
Tender Fee 11800
EMD 3.57 Lakh
Tender Value -
Place Bantwal Bengaluru section
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=886594

Start Date January 08, 2025 21:30
End Date
Expired 21/02/2025

Expired 555 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Disposal of mixed ms scrap by one time contract at ksdl, bengaluru complex on as is where is basis

Disposal of mixed ms scrap by one time contract at ksdl, bengaluru complex on as is where is basis

Read more
Tender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis

Tender for strengthening of 66kv dg-4 by replacing existing coyote conductor by hpc conductor of ampacity 700a from geddalahalli cable tapping tower till 66/11kv hennur cable tapping tower in tlm sub-division, hoody for a length of 230 mtrs & 02 spans in bengaluru south taluk, bengaluru urban district on total turnkey on percentage basis

Read more
Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration

Construction of elevated corridor from marenahalli main road (ragigudda junction) to kanakapura main road via bwssb pipeline road (thalaghattapura junction) in bengaluru city on boot (toll) mode dynamic duration

Read more
Providing new 11kv c&r panel & integration of c&r at 66/11kv national college substations pertaining to operation division hsr layout in the jurisdiction of transmission(operation) south circle, bengaluru on total turnkey percentage tender basis

Providing new 11kv c&r panel & integration of c&r at 66/11kv national college substations pertaining to operation division hsr layout in the jurisdiction of transmission(operation) south circle, bengaluru on total turnkey percentage tender basis

Read more
Annual maintanance of road year of 2026-27 highway connecting kengal (on nh-275) to alur (on sh-110l) via yadiyur,(on nh-75), road from ch 134.57 to 136.67 km and 137.07 to 137.27km and 138.27 to 140.47 km ( 133.36 to 147.59 km and 154.82 to 160.93km)

Annual maintanance of road year of 2026-27 highway connecting kengal (on nh-275) to alur (on sh-110l) via kanva, dasawara, makali, ujjani, hithalapura, huliyurdurga, k honnamachanahalli, keelara, hanchipura, paduvagere, hanumapura gate (on sh-84) kodavatti, yadiyur,(on nh-75), bilagunda, mayasandra,/soravanahalli (on nh150a) bochihalli, talkere, aralikerepalya, vishwanathapura, (on nh-150a), turuvekere, nonavinakere, hedgarahalli, (on sh-47) hunaseghatta, sasalahalli, dasarighatta cross, kenkere (on sh-71) edigarahatti, gandasi (on sh7) mahadevrahalli, bageshpura, (on sh-102) neeragunda, nittur, rayapura, (on sh-21) kadadaravalli (on nh-373), chikkagadduvalli, kalatammanahalli, doddakanagal (sh-275) road from ch 134.57 to 136.67 km and 137.07 to 137.27km and 138.27 to 140.47 km ( 133.36 to 147.59 km and 154.82 to 160.93km)

Read more
Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration

Construction of elevated corridor from yeshwanthapura (methikere cross) to old madras road (tin factory junction kr puram) via iisc - mekri circle - jayamahal - st. john church road - ulsoor lake (3 lane x 2 flyover) in bengaluru city on boot (toll) mode - dynamic duration

Read more
Periodical renewal from km 279.990 to km 286.405 in maddur town limit on nh 275 bantwal bangalore section

Periodical renewal from km 279.990 to km 286.405 in maddur town limit on nh 275 bantwal bangalore section

Read more
Periodical renewal from km 324.090 to km 329.885 in bidadi town limit on nh 275 bantwal bangalore section

Periodical renewal from km 324.090 to km 329.885 in bidadi town limit on nh 275 bantwal bangalore section

Read more
Periodical renewal junction improvement and footpath improvement etc for mandya town from km 256 500 to km 264 900 on nh 275 bantwal bangalore section bypassed stretches

Periodical renewal junction improvement and footpath improvement etc for mandya town from km 256 500 to km 264 900 on nh 275 bantwal bangalore section bypassed stretches

Read more
Periodical renewal from km 279 990 to km 286 405 in maddur town limit on nh 275 bantwal bangalore section

Periodical renewal from km 279 990 to km 286 405 in maddur town limit on nh 275 bantwal bangalore section

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise