Tender Details
Particulars | Details |
---|---|
Title |
Extension/Upgradation Of Link Road To Khalsar By Way Of Laying Ogpc, 25 Mm Thick, B/Wall And Side Drain.
|
Description |
Extension/Upgradation Of Link Road To Khalsar By Way Of Laying Ogpc, 25 Mm Thick, B/Wall And Side Drain.
|
Organisation | Public Works Department | State Govt. and UT |
Tender Id | 2025_PWD_15915_3 |
Reference Number |
02 of PWD RnB Nubra 2025-26 |
Tender Fee | 1000 |
EMD | 27160 |
Tender Value | |
Place | Nubra |
Link | https://tenders.ladakh.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=40204 |
Start Date | May 21, 2025 15:30 |
End Date |
27/05/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreRehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Rehabilitation and upgradation of 2l road with paved shoulders of mangrulpir to mahan nh 161a (design km.75.000 to 107.500)(total length 32.50 km) in the state of maharashtra (maintenance work at risk and cost of contractor)(2nd call)
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreConstruction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Construction of 125 mtr span arch bridge at rd 42 410 on nh 154a sh 125 mtr span through arch bridge formation cutting and filling protection work metalling and tarring road side drain road furniture
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRepairs to drain, internal fencing, retaining walls, approach path, hard standing, interlocking / chequered tiles, outdoor tiles, baby wall, wall cladding etc at sea side, nofra and navy nagar area at various locations under age b/r-i at ns karanja
Repairs to drain, internal fencing, retaining walls, approach path, hard standing, interlocking / chequered tiles, outdoor tiles, baby wall, wall cladding etc at sea side, nofra and navy nagar area at various locations under age b/r-i at ns karanja
Read moreConstruction of cc road and drain from house of sanju dahiya to house of arjun kushwaha in ward 04 maihar
Construction of cc road and drain from house of sanju dahiya to house of arjun kushwaha in ward 04 maihar
Read moreConstruction of cc road and drain from house of govind kol to house of ram gopal in ward 04 maihar
Construction of cc road and drain from house of govind kol to house of ram gopal in ward 04 maihar
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreof your Industry type