Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm Unit Iii Unit Iv Prive Breakdown Maintenance Works Repairing Works Of Air Compressors Make Kg Khosla Model No 2 Ha2 Qt Air Dryers Make Trident Ir As When Required Basis For A Period Of One Year From The Date Of Commencement Of Work
|
Description |
Mtps I Tm Unit Iii Unit Iv Prive Breakdown Maintenance Works Repairing Works Of Air Compressors Make Kg Khosla Model No 2 Ha2 Qt Air Dryers Make Trident Ir As When Required Basis For A Period Of One Year From The Date Of Commencement Of Work
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2025_EB_525641_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM /OT. 301 / 2024-25 |
Tender Fee | 0 |
EMD | 4600 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=625841 |
Start Date | February 18, 2025 00:00 |
End Date |
03/03/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Custom bid for services - one time service and repair of ir make air compressors (model - ir16 & 10
Read more
Mtps i tm unit iv complete overhauling and painting of instrument air compressors iac 4a 4b 4c
Mtps i tm unit iv complete overhauling and painting of instrument air compressors iac 4a 4b 4c
Read moreMtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Mtps i tm stage i ii units i ii iii iv bfps bfbps ceps voith hydraulic couplings and hdps prive break down maintenance for a period of one year from the date of commencement of work
Read moreMtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Mtps i bm lift operation of boiler lifts i to iv and attending routine maintenance and minor repair works of boiler lift ii and its accessories for one year from the date of commencement of works for 2025 26
Read moreNctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit ii attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreNctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Nctps i se m ii ahp dn unit i attending breakdown works in bottom ash hopper scrapper feeder clinker grinders economizer hopper air pre heater hopper and duct hoppers for period of 3 months from the date of taking over of site
Read moreRotex magnet valve 3 way nc 10 type with manifold model 3038c, rotex drg. no. 081-055-02-c working pressure of air 2-10 kg/cm2, coil size iii railway stud type 110 volt dc, 3/8 inch bsp (f) thread pipe connection with manual actuator, body material aluminum embossing of make s.no. & date of mfg. to be done .
For complete deion and other details, please refer to tender
Read moreSp.120 nctps ii es circle em i division sd iv routine maintenance works on unit i and ii turbine auxiliary motors and unit batteries and battery chargers from the date of commencement of work for the period up to 31 march 2026 from the date of t
Sp.120 nctps ii es circle em i division sd iv routine maintenance works on unit i and ii turbine auxiliary motors and unit batteries and battery chargers from the date of commencement of work for the period up to 31 march 2026 from the date of t
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Mtps i boiler rotating parts units iii and iv prive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Read moreof your Industry type