Tender Details

Particulars Details
Title
Mtps I Boiler Rotating Parts Units Iii And Iv Prive And Breakdown Maintenance Works And Other Allied Works As And When Required Basis For The Period Of 365 Days From The Date Of Commencement Of Work
Description
Mtps I Boiler Rotating Parts Units Iii And Iv Prive And Breakdown Maintenance Works And Other Allied Works As And When Required Basis For The Period Of 365 Days From The Date Of Commencement Of Work
Organisation TNEB Limited | State Govt. and UT
Tender Id 2025_EB_529968_1
Reference
Number
CE / MTPS-I / SE / M-I / BM /OT.312 / 2024-25
Tender Fee 0
EMD 23900
Tender Value -
Place Mettur Thermal Power Station-I / Mettur Dam
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631001

Start Date March 05, 2025 20:30
End Date
Expired 19/03/2025

Expired 573 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement

Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement

Read more
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.

Read more
Offloading the work of repairing /rewinding of 20 nos. self starter and 15 nos. alternator of various hemms of krishnashila project on as and when required basis for a period of 365 days

Offloading the work of repairing /rewinding of 20 nos. self starter and 15 nos. alternator of various hemms of krishnashila project on as and when required basis for a period of 365 days

Read more
Tnpgcl ustpp1 m ii echp mechanical preventive breakdown maintenance works of belt and pipe conveyors and its allied equipment equipment in junction towers and fire protection detection systems for the period of one year from the date of commencement

Tnpgcl ustpp1 m ii echp mechanical preventive breakdown maintenance works of belt and pipe conveyors and its allied equipment equipment in junction towers and fire protection detection systems for the period of one year from the date of commencement

Read more
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.

Read more
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required

Read more
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027

Read more
Mtps i boiler rotating parts units iii and iv preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Mtps i boiler rotating parts units iii and iv preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Read more
Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Read more
Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise