Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Boiler Rotating Parts Units Iii And Iv Prive And Breakdown Maintenance Works And Other Allied Works As And When Required Basis For The Period Of 365 Days From The Date Of Commencement Of Work
|
| Description |
Mtps I Boiler Rotating Parts Units Iii And Iv Prive And Breakdown Maintenance Works And Other Allied Works As And When Required Basis For The Period Of 365 Days From The Date Of Commencement Of Work
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_529968_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / BM /OT.312 / 2024-25 |
| Tender Fee | 0 |
| EMD | 23900 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631001 |
| Start Date | March 05, 2025 20:30 |
| End Date |
Expired
19/03/2025
Expired 573 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Rendering para medical assistance at mtps ii dispensary through outsourcing for a period of 365 days from the date of commencement
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreOffloading the work of repairing /rewinding of 20 nos. self starter and 15 nos. alternator of various hemms of krishnashila project on as and when required basis for a period of 365 days
Offloading the work of repairing /rewinding of 20 nos. self starter and 15 nos. alternator of various hemms of krishnashila project on as and when required basis for a period of 365 days
Read moreTnpgcl ustpp1 m ii echp mechanical preventive breakdown maintenance works of belt and pipe conveyors and its allied equipment equipment in junction towers and fire protection detection systems for the period of one year from the date of commencement
Tnpgcl ustpp1 m ii echp mechanical preventive breakdown maintenance works of belt and pipe conveyors and its allied equipment equipment in junction towers and fire protection detection systems for the period of one year from the date of commencement
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esv iv and hpt ipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2026 27 as and when required
Read moreBtps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Btps - chp - cold vulcanization belt joints, pulley lagging for the 1400mm bw conveyors, bcn-4a/b, bcn-5a/b, bcn-6a/b, 7a/b and bcn-10 of conveyors as and when required in mm-iii sub division of mm/chp/btps from actual date of commencement of work to 31.03.2027
Read moreMtps i boiler rotating parts units iii and iv preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Mtps i boiler rotating parts units iii and iv preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Read moreMtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Read moreMtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Mtps i boiler rotating parts units i and ii preventive and breakdown maintenance works and other allied works as and when required basis for the period of 365 days from the date of commencement of work
Read moreof your Industry type